Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rate Contract For Motor Rewinding Of Different Rating Of Bktpp As And When Basis (Greater 22 Kw To 160 Kw Motors Rewinding) For Two Years
|
| Description |
Rate Contract For Motor Rewinding Of Different Rating Of Bktpp As And When Basis (Greater 22 Kw To 160 Kw Motors Rewinding) For Two Years
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_835982_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E3695/25-26 |
| Tender Fee | 0 |
| EMD | 26628 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1865586 |
| Start Date | May 03, 2025 16:30 |
| End Date |
Expired
17/05/2025
Expired 517 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Repairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Read moreRepairing, rewinding of 8 nos squirrel case lt induction motors ( 2 x 90 kw , 4 x 37 kw and 2 x 22 kw ) of chp under dudhichua project.
Repairing, rewinding of 8 nos squirrel case lt induction motors ( 2 x 90 kw , 4 x 37 kw and 2 x 22 kw ) of chp under dudhichua project.
Read moreBiennial rate contract for repair and rewinding of lt motors for gtps for two years
Biennial rate contract for repair and rewinding of lt motors for gtps for two years.(please refer the tender documents)
Read moreAnnual maintenance contract for repair/rewinding of motors and other electrical equipments in workshop area for two years.
Annual maintenance contract for repair/rewinding of motors and other electrical equipments in workshop area for two years.
Read moreRate contract for rewinding of faulty traction motors (220 kw, 3-phase scim, abb make) of bombardier (bt) make trains of dmrc ltd.
Rate contract for rewinding of faulty traction motors (220 kw, 3-phase scim, abb make) of bombardier (bt) make trains of dmrc ltd.
Read moreCustom bid for services - annual rate contract for rewinding / repairing, testing, loading, both side transportation of ht motors on as and when required basis for gail mangalore petrochemicals limited
Custom bid for services - annual rate contract for rewinding / repairing, testing, loading, both side transportation of ht motors on as and when required basis for gail mangalore petrochemicals limited
Read moreS.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
S.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
Read moreS.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
S.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
Read moreTaking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Read moreRate contract for motor rewinding of different rating of bktpp as and when basis (greater 22kw to 160 kw motors rewinding) for two years
Rate contract for motor rewinding of different rating of bktpp as and when basis (greater 22kw to 160 kw motors rewinding) for two years
Read moreof your Industry type