Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Eruva Devaswom Mavelikkara Group Repaires To The Fallen Down Portion Of Temple Pond Retaining Wall Out Side The Temple Compound
|
| Description |
Eruva Devaswom Mavelikkara Group Repaires To The Fallen Down Portion Of Temple Pond Retaining Wall Out Side The Temple Compound
|
| Organisation | Travancore Devaswom Board | State Govt. and UT |
| Tender Id | 2024_TDB_682717_1 |
|
Reference Number |
EEM/ET-44/2024-25 |
| Tender Fee | 1180 |
| EMD | 12000 |
| Tender Value | - |
| Place | ERUVA |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1062146 |
| Start Date | July 27, 2024 23:30 |
| End Date |
Expired
30/07/2024
Expired 805 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kodungoor devaswom-mundakkayam group-reconstructing the collapsed retaining wall of temple tank
Kodungoor devaswom-mundakkayam group-reconstructing the collapsed retaining wall of temple tank
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEruva devaswom -mavelikkara group -repaires to the fallen down portion of temple pond retaining wall out side the temple compound. retender
Eruva devaswom -mavelikkara group -repaires to the fallen down portion of temple pond retaining wall out side the temple compound. retender
Read moreMavelikkara devaswom in mavelikkara group reconstruction of the fallen down portion of retaining wall including repairs to the platform and steps of velakkulam.
Mavelikkara devaswom in mavelikkara group reconstruction of the fallen down portion of retaining wall including repairs to the platform and steps of velakkulam.
Read moreVathukulangara devaswom in harippad group repairs to the fallen down portion of retaining wall of the temple pond near sevapandal reg
Vathukulangara devaswom in harippad group repairs to the fallen down portion of retaining wall of the temple pond near sevapandal reg
Read moreVathukulangara devaswom in harippad group repairs to the fallen down portion of retaining wall of the temple pond near sevapandal reg. retender
Vathukulangara devaswom in harippad group repairs to the fallen down portion of retaining wall of the temple pond near sevapandal reg. retender
Read moreChettikulangara devaswom in mavelikkara group - reconstructing the fallen down portion of compound wall near kavu
Chettikulangara devaswom in mavelikkara group - reconstructing the fallen down portion of compound wall near kavu
Read moreCheriyandu devaswom in mavelikkara group-fallen down portion of compound wall south side of east gopuram.
Cheriyandu devaswom in mavelikkara group-fallen down portion of compound wall south side of east gopuram.
Read moreKandakalan nada devaswom in mavelikkara group-reconstructing fallen down and leaning portion of compound wall-reg.
Kandakalan nada devaswom in mavelikkara group-reconstructing fallen down and leaning portion of compound wall-reg.
Read moreNagari devaswom in harippad group-repairs to the fallen down portion of retaining wall (revised estimate). retender
Nagari devaswom in harippad group-repairs to the fallen down portion of retaining wall (revised estimate). retender
Read moreof your Industry type