Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Constructing Rai Village Firni With Rmc In Ward 8 Under Mc Sonipat
|
Description |
Estimate For Constructing Rai Village Firni With Rmc In Ward 8 Under Mc Sonipat
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_356522_1 |
Reference Number |
2024B1D5109A CC76 41DD BFEB B12119C2DCE1292ULB |
Tender Fee | 16180 |
EMD | 2.57 Lakh |
Tender Value | |
Place | Sonepat |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=431888 |
Start Date | February 21, 2024 23:30 |
End Date |
14/03/2024 ( Expired 435 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreWsp of 233 villages gangatalai 97 anandpuri 136 of dist banswara from jher anicut near terminal point of mahi anas river adana back water pkg 02 cluster village distribution system including fhtc under jjm with o and m for 10 yrs after dlp of 1yr
Wsp of 233 villages gangatalai 97 anandpuri 136 of dist banswara from jher anicut near terminal point of mahi anas river adana back water pkg 02 cluster village distribution system including fhtc under jjm with o and m for 10 yrs after dlp of 1yr
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSupply of moorum with royalty to different ward for the year 2025-26 under np raghogarh vijaypur
Supply of moorum with royalty to different ward for the year 2025-26 under np raghogarh vijaypur
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreFor special repair of various rural link road in mc dakala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
For special repair of various rural link road in mc dakala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
Read moreFor special repair of various rural link road in mc samana compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
For special repair of various rural link road in mc samana compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
Read moreFor special repair of various rural link road in mc dudhan sadhan compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mcmb funds, distt pat
For special repair of various rural link road in mc dudhan sadhan compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mcmb funds, distt pat
Read moreFor special repair of various rural link road in mc patiala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
For special repair of various rural link road in mc patiala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
Read moreof your Industry type