Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Resumption Of Balance Work Of Construction Of Tagore Cultural Complex And Open Air Theatre At Bharathiyar Palkalaikoodam Campus, Ariyankuppam, Puducherry
|
Description |
Resumption Of Balance Work Of Construction Of Tagore Cultural Complex And Open Air Theatre At Bharathiyar Palkalaikoodam Campus, Ariyankuppam, Puducherry
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWDC1_18548_1 |
Reference Number |
12/PW/BRN/25-26 |
Tender Fee | 1575 |
EMD | 15.69 Lakh |
Tender Value | |
Place | Puducherry |
Link | https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18902 |
Start Date | May 19, 2025 15:55 |
End Date |
09/06/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreBalance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Balance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read moreConstruction and beautification work of shopping complex at ward no 13 in front of sbi.
Construction and beautification work of shopping complex at ward no 13 in front of sbi.
Read moreConstruction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Read moreConstruction of c c road drain interlocking culvert and r c c cover of munshiganj colony under infrastructure work at district sitapur
Construction of c c road drain interlocking culvert and r c c cover of munshiganj colony under infrastructure work at district sitapur
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreof your Industry type