Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
External Sup Socket 125 A,415 V,Ip67,5 Pole
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106375849 |
|
Reference Number |
08240089 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106375849/viewNitPdf_4605722.pdf |
| Start Date | June 13, 2024 20:57 |
| End Date |
Expired
17/06/2024
Expired 846 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Read moreConducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Read moreTggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.
Tggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.
Read moreProviding external electrification to residential latyout of muda at sy no 6/1, 5/1 at kunjathbail in mangaluru urban development authority limits
Providing external electrification to residential latyout of muda at sy no 6/1, 5/1 at kunjathbail in mangaluru urban development authority limits
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreProcurement of brass ball valve 20mm, 50mm, ms gi nipple-pipe 20mm, and ms gi socket-pipe 20mm for use at pump section, ocp-3, rg2
Procurement of brass ball valve 20mm, 50mm, ms gi nipple-pipe 20mm, and ms gi socket-pipe 20mm for use at pump section, ocp-3, rg2
Read moreI) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
I) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
Read moreMaintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type