Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation And Maintenance Of Conveyor Belt Systems Etc. I/C Watch And Ward Staff For Conveyors And Trash Boom Barriers Laying In Trunk Drain No.1 Between Rd 0 M To Rd 5260 M.
|
| Description |
Operation And Maintenance Of Conveyor Belt Systems Etc. I/C Watch And Ward Staff For Conveyors And Trash Boom Barriers Laying In Trunk Drain No.1 Between Rd 0 M To Rd 5260 M.
|
| Organisation | Government of NCT of Delhi |
| Tender Id | 2023_IFC_249382_1 |
|
Reference Number |
EE/MD-II/ASW/24/2023-24 |
| Tender Fee | 0 |
| EMD | 31338 |
| Tender Value | - |
| Place | Office of the Executive Engineer MD II |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in |
| Start Date | October 25, 2023 21:20 |
| End Date |
Expired
02/11/2023
Expired 1080 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreOperation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in trunk drain no.1 between rd 0m to rd 5500m
Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in trunk drain no.1 between rd 0m to rd 5500m
Read moreOperation and maintenance of conveyor belt systems etc. including watch and ward staff for conveyors and trash boom barriers laying in various sites of trunk drain no.1 ,barapulla drain, outfall of drains and yamuna river.
Operation and maintenance of conveyor belt systems etc. including watch and ward staff for conveyors and trash boom barriers laying in various sites of trunk drain no.1 ,barapulla drain, outfall of drains and yamuna river.
Read moreOperation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in barapula drain between oberai hotel (lodhi hotel) bridge to outfall of yamuna river under jurisdiction of cd iii ifc.
Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in barapula drain between oberai hotel (lodhi hotel) bridge to outfall of yamuna river under jurisdiction of cd iii ifc.
Read moreMaintenance of trunk drain no.1 between rd-5260m to rd-8000m pwd bridge for the period of 6 (six) months.
Maintenance of trunk drain no.1 between rd-5260m to rd-8000m pwd bridge for the period of 6 (six) months.
Read moreDesilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 08 months
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 08 months
Read moreDesilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months
Read moreDesilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months
Read moreDesilting of trunk drain no.-1 in between rd 5260m to rd 4200m manually and disposal of desilted earth from pwd road, road no.57. right bank of trunk drian 1.
Desilting of trunk drain no.-1 in between rd 5260m to rd 4200m manually and disposal of desilted earth from pwd road, road no.57. right bank of trunk drian 1.
Read moreSupplying, conjoining i/c laying on water of high quality water tight hdpe floating boom barrier in trunk drain-i and fabrication work for structure of conveyor belt as per design i/c installation etc. at different sites between rd-0m to rd-5260m und
Supplying, conjoining i/c laying on water of high quality water tight hdpe floating boom barrier in trunk drain-i and fabrication work for structure of conveyor belt as per design i/c installation etc. at different sites between rd-0m to rd-5260m und
Read moreof your Industry type