Tender Details

Particulars Details
Title
Operation And Maintenance Of Conveyor Belt Systems Etc. I/C Watch And Ward Staff For Conveyors And Trash Boom Barriers Laying In Trunk Drain No.1 Between Rd 0 M To Rd 5260 M.
Description
Operation And Maintenance Of Conveyor Belt Systems Etc. I/C Watch And Ward Staff For Conveyors And Trash Boom Barriers Laying In Trunk Drain No.1 Between Rd 0 M To Rd 5260 M.
Organisation Government of NCT of Delhi
Tender Id 2023_IFC_249382_1
Reference
Number
EE/MD-II/ASW/24/2023-24
Tender Fee 0
EMD 31338
Tender Value -
Place Office of the Executive Engineer MD II
Link
View Original Tender Notice

https://govtprocurement.delhi.gov.in

Start Date October 25, 2023 21:20
End Date
Expired 02/11/2023

Expired 1081 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in trunk drain no.1 between rd 0m to rd 5500m

Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in trunk drain no.1 between rd 0m to rd 5500m

Read more
Operation and maintenance of conveyor belt systems etc. including watch and ward staff for conveyors and trash boom barriers laying in various sites of trunk drain no.1 ,barapulla drain, outfall of drains and yamuna river.

Operation and maintenance of conveyor belt systems etc. including watch and ward staff for conveyors and trash boom barriers laying in various sites of trunk drain no.1 ,barapulla drain, outfall of drains and yamuna river.

Read more
Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in barapula drain between oberai hotel (lodhi hotel) bridge to outfall of yamuna river under jurisdiction of cd iii ifc.

Operation and maintenance of conveyor belt systems etc. i/c watch and ward staff for conveyors and trash boom barriers laying in barapula drain between oberai hotel (lodhi hotel) bridge to outfall of yamuna river under jurisdiction of cd iii ifc.

Read more
Maintenance of trunk drain no.1 between rd-5260m to rd-8000m pwd bridge for the period of 6 (six) months.

Maintenance of trunk drain no.1 between rd-5260m to rd-8000m pwd bridge for the period of 6 (six) months.

Read more
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 08 months

Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 08 months

Read more
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months

Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months

Read more
Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months

Desilting of trunk drain no.-i including disposal of desilted material between rd 5260m to rd 6690m including maintenance for 06 months

Read more
Desilting of trunk drain no.-1 in between rd 5260m to rd 4200m manually and disposal of desilted earth from pwd road, road no.57. right bank of trunk drian 1.

Desilting of trunk drain no.-1 in between rd 5260m to rd 4200m manually and disposal of desilted earth from pwd road, road no.57. right bank of trunk drian 1.

Read more
Supplying, conjoining i/c laying on water of high quality water tight hdpe floating boom barrier in trunk drain-i and fabrication work for structure of conveyor belt as per design i/c installation etc. at different sites between rd-0m to rd-5260m und

Supplying, conjoining i/c laying on water of high quality water tight hdpe floating boom barrier in trunk drain-i and fabrication work for structure of conveyor belt as per design i/c installation etc. at different sites between rd-0m to rd-5260m und

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise