Tender Details

Particulars Details
Title
Repairing Of Main Frame Of Rel 9 (Rel750 E Model) Drill Machine Working At Nigahi Project
Description
Repairing Of Main Frame Of Rel 9 (Rel750 E Model) Drill Machine Working At Nigahi Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_315404_1
Reference
Number
NGH/EXCV/TENDERS/24-25/104
Tender Fee 0
EMD 900
Tender Value -
Place NIGAHI PROJECT
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326864

Start Date August 20, 2024 15:00
End Date
Expired 05/09/2024

Expired 770 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Painting spray gun for automatic painting booth with following specification: model: wa200, working pr

Painting spray gun for automatic painting booth with following specification: model: wa200, working pr

Read more
Annual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).

Annual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).

Read more
Procurement of 27.00xr49 radial tyres with o ring for komatsu hd785-7 model 100t dumpers working in ocps.

Procurement of 27.00xr49 radial tyres with o ring for komatsu hd785-7 model 100t dumpers working in ocps.

Read more
Head loss apparatus for minor losses hydraulics lab,centrifugal pump hydraulics lab,friction losses through pipes hydraulics lab,glass u tube manometer manufacturer hydraulics lab,combined shear force and bending moment apparatus,behaviour of column and strut experimental apparatus,principle stress and strain measuring instrument,digital turbidity meter phe lab,digital ph meter phe lab,bod incubator phe lab,digital tds meter phe lab,distillation assembly phe lab,split cylinder test apparatus for tensile strength of concrete,le chatlier apparatus construction material lab,stainless steel hot air oven,working models of gear trains all types,working models of all the in of double slider crank chain mechanism,gear box working model,working model of different brakes,working model of different clutches,vernier calipers digital,thread measuring instrument,jrm whirling hygrometers psychrometers,digital thermo anemometer for air velocity and temperature,drill machine vice,drill chuck with key half inch capacity

Head loss apparatus for minor losses hydraulics lab,centrifugal pump hydraulics lab,friction losses through pipes hydraulics lab,glass u tube manometer manufacturer hydraulics lab,combined shear force and bending moment apparatus,behaviour of column and strut experimental apparatus,principle stress and strain measuring instrument,digital turbidity meter phe lab,digital ph meter phe lab,bod incubator phe lab,digital tds meter phe lab,distillation assembly phe lab,split cylinder test apparatus for tensile strength of concrete,le chatlier apparatus construction material lab,stainless steel hot air oven,working models of gear trains all types,working models of all the in of double slider crank chain mechanism,gear box working model,working model of different brakes,working model of different clutches,vernier calipers digital,thread measuring instrument,jrm whirling hygrometers psychrometers,digital thermo anemometer for air velocity and temperature,drill machine vice,drill chuck with key half inch capacity

Read more
Repair of non-working street lights of villages in ward no. 9 under electrical sub division no. 2, m.c. chandigarh.

Repair of non-working street lights of villages in ward no. 9 under electrical sub division no. 2, m.c. chandigarh.

Read more
Otr tyre demounting, mounting, disassembling, assembling and tyre inflation pressure checking work of various model 190t dumpers at new workshop at site at nigahi project for the period of 12 months/365 days.

Otr tyre demounting, mounting, disassembling, assembling and tyre inflation pressure checking work of various model 190t dumpers at new workshop at site at nigahi project for the period of 12 months/365 days.

Read more
Advance work including raising of seedlings under anr model in ddf scheme korakodu sy no 9,anavatti range 25.00ha (8x12)

Advance work including raising of seedlings under anr model in ddf scheme korakodu sy no 9,anavatti range 25.00ha (8x12)

Read more
Annual plan-mannur gp 2026-2027-model nursery school road maintenance (pro no 79) (ward no 9) -general civil work-.

Annual plan-mannur gp 2026-2027-model nursery school road maintenance (pro no 79) (ward no 9) -general civil work-.

Read more
Rto passing/fitness alongwith required repairing works of 9 nos. of tata 407 vehicles working under maintenance department, najafgarh zone, mcd. nit no 7

Rto passing/fitness alongwith required repairing works of 9 nos. of tata 407 vehicles working under maintenance department, najafgarh zone, mcd. nit no 7

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise