Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Hiring Of Machinery For Rainy Season, Rainy Water And Sewage Disposal In Ward 14, Division 1 B Under Mcg.
|
Description |
Estimate For Hiring Of Machinery For Rainy Season, Rainy Water And Sewage Disposal In Ward 14, Division 1 B Under Mcg.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2180 |
EMD | 27690 |
Tender Value | |
Place | Gurugram |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 00:00 |
End Date |
30/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreHiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Hiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Construction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Read moreHiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Hiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreof your Industry type