Shifting, Pulling N Dismantling Of 2nos Switches And Shifting, Pulling N Installation Of Switches Along With Goab Switch With Switch Foundation In Unitized Substation In Respect Of Iwsp, Bn K Area.
|
| Description |
Shifting, Pulling N Dismantling Of 2nos Switches And Shifting, Pulling N Installation Of Switches Along With Goab Switch With Switch Foundation In Unitized Substation In Respect Of Iwsp, Bn K Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_329449_5 |
|
Reference Number |
SO(EnM)/e-tender/24-25/28 |
| Tender Fee | 0 |
| EMD | 7000 |
| Tender Value | - |
| Place | IWSP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341494 |
| Start Date | February 20, 2025 16:30 |
| End Date |
Expired
01/03/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
Read moreSupply of application servers,supply of database servers,supply of ntp server,supply of data entry terminals,supply of true colour led outdoor display board,supply of 110 inches or higher led displays,supply of 65 inches or higher led displays,supply of vertical standee with 65 inches or higher,supply of 55 inches or higher led displays,supply of 43 inches or higher led displays,supply of 32 inches or higher led displays,supply of 20 kva ups n plus 1,supply of fids package software,supply of kvm switch with 17 inches tft,supply of layer 3 network switch of 24 ports,supply of light guide interconnect unit,supply of 08 port switches,supply of 42u 19 inches rack,supply of ss pole of square shape to fix 2 displays,supply of ss pole of square shape to fix 4 displays,supply of ss pole of square shape to fix 8 displays,installation of application servers,installation of database servers,installation of ntp server,installation of data entry terminals,installation of true colour led outdoor displays,installation of 11
Supply of application servers,supply of database servers,supply of ntp server,supply of data entry terminals,supply of true colour led outdoor display board,supply of 110 inches or higher led displays,supply of 65 inches or higher led displays,supply of vertical standee with 65 inches or higher,supply of 55 inches or higher led displays,supply of 43 inches or higher led displays,supply of 32 inches or higher led displays,supply of 20 kva ups n plus 1,supply of fids package software,supply of kvm switch with 17 inches tft,supply of layer 3 network switch of 24 ports,supply of light guide interconnect unit,supply of 08 port switches,supply of 42u 19 inches rack,supply of ss pole of square shape to fix 2 displays,supply of ss pole of square shape to fix 4 displays,supply of ss pole of square shape to fix 8 displays,installation of application servers,installation of database servers,installation of ntp server,installation of data entry terminals,installation of true colour led outdoor displays,installation of 11
Read moreInstallation and commissioning of bus bar for feeding power to 3 mva, 11kv/3.3kv power transformer and both primary n secondary side controlling switches at unitized substation under iwsp, bnk area.
Installation and commissioning of bus bar for feeding power to 3 mva, 11kv/3.3kv power transformer and both primary n secondary side controlling switches at unitized substation under iwsp, bnk area.
Read morePainting of transformer, switches (11kv,3.3kv), motor pump and starter of iwsp, bnk area
Painting of transformer, switches (11kv,3.3kv), motor pump and starter of iwsp, bnk area
Read moreLaying of gravels at unitized substation, fencing work of 750kva, 11kv/550v transformer n nearby areas of unitized substation along with repairing of different entry/door gates in respect of iwsp, bnk area
Laying of gravels at unitized substation, fencing work of 750kva, 11kv/550v transformer n nearby areas of unitized substation along with repairing of different entry/door gates in respect of iwsp, bnk area.
Read moreShifting, pulling n dismantling dsm-4 with 60hp motor and installation of dsm-5 with 125hp motor including alteration work of base plate for matching the same and fitting of coupling tyre of different size at iwsp, bnk area
Shifting, pulling n dismantling dsm-4 with 60hp motor and installation of dsm-5 with 125hp motor including alteration work of base plate for matching the same and fitting of coupling tyre of different size at iwsp, bnk area
Read moreReplacement of old ,damaged goab switches and earthpit arrangement for 3.3kv oh line at gm unit of bnk area
Replacement of old ,damaged goab switches and earthpit arrangement for 3.3kv oh line at gm unit of bnk area
Read moreReplacement of old, damaged goab switches and earthpit arrangement for 3.3kv oh line at gm unit of bnk area.
Replacement of old, damaged goab switches and earthpit arrangement for 3.3kv oh line at gm unit of bnk area.
Read moreRepairing cum replacing of damaged lt switches and replacing damaged service wires at different locations within area of iwsp, bnk area