Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Various Size Carbon Steel Pipes And Fittings For Unit Iv And V Boiler Feed Pump System And Air Compressor System
|
Description |
Supply Of Various Size Carbon Steel Pipes And Fittings For Unit Iv And V Boiler Feed Pump System And Air Compressor System
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_528966_1 |
Reference Number |
CE/TTPS/4197M |
Tender Fee | 0 |
EMD | 8500 |
Tender Value | |
Place | Tuticorin |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629897 |
Start Date | March 01, 2025 18:30 |
End Date |
17/03/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreSupply of advanced high energy linear accelerator system 01 unit
Supply of advanced high energy linear accelerator system 01 unit for the department of radiation oncology
Read moreSupply of topographical equipments for hiu, wrd under airbmp lot 1 supply, installation and commissioning of gnss system with accessories
Supply of topographical equipments for hiu, wrd under airbmp&#x0d lot 1 supply, installation and commissioning of gnss system with accessories.
Read moreRepair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreSupply and installation of benchtop lcms/ms system for biochemistry
Supply and installation of benchtop lcms/ms system for biochemistry
Read moreSupply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Supply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Read moreSupply of permanently lubricated hdpe telecom duct (size 40/33 mm) and accessories for use as underground optical fiber cable conduits in railtel optic fiber network for deposit work and onm purposes
Supply of permanently lubricated hdpe telecom duct (size 40/33 mm) and accessories for use as underground optical fiber cable conduits in railtel optic fiber network for deposit work and onm purposes
Read moreSupply of sampling system for cdw and pp unit
Supply of sampling system for cdw and pp unit
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreof your Industry type