Tender Details
Particulars | Details |
---|---|
Title |
Work Of Installation Of Water Storage System And Necessary Piping Arrangments For Proper Dust Supression At New Feeder Breaker Of Slg Siding Under Govindpur Area
|
Description |
Work Of Installation Of Water Storage System And Necessary Piping Arrangments For Proper Dust Supression At New Feeder Breaker Of Slg Siding Under Govindpur Area
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_329167_1 |
Reference Number |
BCCL/GA-III/AM (EnM) E-TENDER/2024-25/214 |
Tender Fee | 0 |
EMD | 2991 |
Tender Value | |
Place | Govindpur Area Office |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341185 |
Start Date | February 19, 2025 16:30 |
End Date |
25/02/2025 ( Expired 78 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreInstallation and commissioning of ash water recovery system under capex 2025 2026
Installation and commissioning of ash water recovery system under capex 2025 2026
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreJp/b862-102-pl-t-4100/1014 automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreSupply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary storage in nsl
Supply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary 
 storage in nsl
Read more85944 repair, maint and replacement of lift eqpt and other connected works at new ch(sc) and connected area of age e/m-ii under ge (south) pune
85944 repair, maint and replacement of lift eqpt and other connected works at new ch(sc) and connected area of age e/m-ii under ge (south) pune
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreRepair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Repair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Read moreof your Industry type