Tender Details

Particulars Details
Title
C/O Hig (Multi Storeyed) Houses Including Internal Development And Electrification In Sector 19 B, Dwarka Phase Ii (A Turnkey Project).
Description
Providing And Fixing Frp Jali In Balance Plumbing Shafts And P/F Of Architrave In Remaining Flats At C/O Hig (Multi Storeyed) Houses Including Internal Development And Electrification In Sector 19 B, Dwarka.
Organisation Delhi Development Authority | Central Govt. Ministry/Department
Tender Id 2025_DDA_844808_1
Reference
Number
15/EE/DPD-4/DDA/2024-25
Tender Fee 0
EMD 4.44 Lakh
Tender Value
Place EE/DPD-4
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=888046

Start Date January 17, 2025 22:55
End Date
Expired 24/01/2025

Expired 526 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maint and repairs to internal electrification connected works of otm and md accn in zone-i, ii and iii under age e/m-i of ge (north ) meerut cantt

Maint and repairs to internal electrification connected works of otm and md accn in zone-i, ii and iii under age e/m-i of ge (north ) meerut cantt

Read more
Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).

Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).

Read more

Planning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.

Read more
C/o hig (multi-storeyed) houses including internal development and electrification in sector-19b, dwarka phase-ii (a turnkey project).

Construction of rmu (ring main unit) at c/o hig (multi-storeyed) houses including internal development and electrification in sector-19b, dwarka phase-ii (a turnkey project).

Read more
C/o hig (multi-storeyed) houses including internal development and electrification in sector-19b, dwarka phase-ii (a turnkey project).

Covering of plumbing shaft with frp jali and p/f of architrave at c/o hig (multi-storeyed) houses including internal development and electrification in sector-19b, dwarka phase-ii.

Read more
Sitc of external lighting at dda hig housing golf facing condos flats sector 19b dwarka

C o hig multi storeyed houses including internal development and electrification in sector19b dwarka ph ii a turnkey project

Read more
C/o hig (multi-storeyed) houses including internal development and electrification in sector 19b , dwraka phase ii ( a turnkey project)

Raising the height of existing scheme boundary wall and construction of additional gate at c/o hig (multi-storeyed) houses including internal development and electrification in sector 19b , dwraka phase ii.

Read more
C/o hig (multi-storeyed) houses including internal development and electrification in sector-19b, dwraka phase-ii (a turnkey project)

Raising the height of existing scheme boundary wall and construction of additional gate at c/o hig (multi-storeyed) houses including internal development and electrification in sector-19b ,dwraka phase-ii

Read more
C/o hig (multi-storeyed) houses including internal development electrification in sector-19b, dwarka phase-ii (a turnkey project).

Providing and fixing open gym, tot lots, badminton courts, lawn tennis and basket ball court at sector-19b, dwarka. (specialized work).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise