Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pune Daund Section: Work Of Extension Of Barrel Length Of 7 Bridges Under Aden Dd.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73572234 |
|
Reference Number |
DRM-W-PA-E-Tend-2023-N-32 |
| Tender Fee | 0 |
| EMD | 7.84 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73572234/viewNitPdf_4480038.pdf |
| Start Date | February 28, 2024 22:20 |
| End Date |
Expired
01/04/2024
Expired 930 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying, stacking and loading into railway hoppers of machine crushed ballast as per revised specification rdso/ irse-ge-i of june 2016 with latest amendment at daund depot under aden/dd s section.
Supplying, stacking and loading into railway hoppers of machine crushed ballast as per revised specification rdso/ irse-ge-i of june 2016 with latest amendment at daund depot under aden/dd s section.
Read moreStrengthening of pasgarhi-deori -janakpur road length 0.20 km total length 31.49 km.
Strengthening of pasgarhi-deori -janakpur road length 0.20 km total length 31.49 km.
Read moreElectrical trd portion work in in connection with extension of pit line by 290 meter to accommodate full length coaching rack at dd station of pune division.
Electrical trd portion work in in connection with extension of pit line by 290 meter to accommodate full length coaching rack at dd station of pune division.
Read moreStrengthening work of anarad to nihaldevi road at ch 34/2 length 350 m and ch 34/6 length 150 m) total length 500m
Strengthening work of anarad to nihaldevi road at ch 34/2 length 350 m and ch 34/6 length 150 m) total length 500m
Read moreSide lock holder bt 40 at3 taper dia 20x135 through flange coolant for barrel extension lmg 5.56mm.
Side lock holder bt 40 at3 taper dia 20x135 through flange coolant for barrel extension lmg 5.56mm.
Read moreSpecial strenthening work of 1. jewnara to keregaon road length- 2.30 km 2.kulpa to chicamtola road length- 2.20 km 3. benegaon to katori road length- 1.80 km 4. benegaon to salhe road length- 2.80 km 5. bahela to gorre road length- 2.40 km
Special strenthening work of 1. jewnara to keregaon road length- 2.30 km 2.kulpa to chicamtola road length- 2.20 km 3. benegaon to katori road length- 1.80 km 4. benegaon to salhe road length- 2.80 km 5. bahela to gorre road length- 2.40 km
Read moreStrengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Strengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Read moreStrengthening work of hatkheda to tarawali length 1.00 km., gyaraspur to indrawas road length 1.80 km. and madankhedi to guriyakhedi bhoriya road to pathari haweli via parsora haweli road length 3.70 km. total length 6.50 km. iind call
Strengthening work of hatkheda to tarawali length 1.00 km., gyaraspur to indrawas road length 1.80 km. and madankhedi to guriyakhedi bhoriya road to pathari haweli via parsora haweli road length 3.70 km. total length 6.50 km. iind call
Read moreConsturction of khatunga to dhardi makhanganj road length 21.50 km. din neemuch
Consturction of khatunga to dhardi makhanganj road length 21.50 km. din neemuch
Read moreConstruction of ubora to pucchikagusn road length 12.00 k.m with electirification work
Construction of ubora to pucchikagusn road length 12.00 k.m with electirification work
Read moreof your Industry type