Tn 5221 Work Of Capital And Routine Maintenance Of Boiler Pressure Part Area (Hp/Lp Welding Of Boiler/Turbine Area, Hp/Lp Valves, Soot Blowers And Its Associated Works) Of Unit 1 To 7 At Kstps, Kota.
|
| Description |
Work Of Capital And Routine Maintenance Of Boiler Pressure Part Area (Hp/Lp Welding Of Boiler/Turbine Area, Hp/Lp Valves, Soot Blowers And Its Associated Works) Of Unit 1 To 7 At Kstps, Kota.
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_RRVUN_377040_1 |
|
Reference Number |
TN-5221 |
| Tender Fee | 1180 |
| EMD | 6.62 Lakh |
| Tender Value | - |
| Place | Kota Super Thermal Power Station |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | December 20, 2023 17:30 |
| End Date |
Expired
18/01/2024
Expired 1002 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreWork contract of routine maintenance of boiler firing and coal feed system, complete fan group along with lop system, hp lp dozing system and fuel pressuring hfo and ldo pumps system of unit no. 1 to 4 of ph i and ph ii at sgtps, mppgcl, birsinghpur
Work contract of routine maintenance of boiler firing and coal feed system, complete fan group along with lop system, hp lp dozing system and fuel pressuring hfo and ldo pumps system of unit no. 1 to 4 of ph i and ph ii at sgtps, mppgcl, birsinghpur
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreTn-5383 capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Read moreCapital overhauling of hp,ip and lp turbine mtps dvc
Capital overhauling of hp,ip and lp turbine, inspection of tg bearings and alignment checking, overhauling of generator, overhauling of tg , hp and ip stop and control valves along with their servomotors and associated job of unit no 5 mtps, dvc
Read morePrive/breakdown maintenance of hp/lp valves/safety valves, routine de-slagging/soot removal and prive/breakdown maintenance of wall blowers lrsb of boiler and other associated work of boile
Prive/breakdown maintenance of hp/lp valves/safety valves, routine de-slagging/soot removal and prive/breakdown maintenance of wall blowers lrsb of boiler and other associated work of boiler of unit no. 5 6, 2x250 mw, ctps, parichha, jhansi
Read moreAnnual work contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (hp/lp valves, soot blowers, hangers , fuel oil system, hp welding, etc.) of 2x660 mw csctpp, rvunl
Annual work contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (hp/lp valves, soot blowers, hangers , fuel oil system, hp welding, etc.) of 2x660 mw csctpp, rvunl
Read morePrive/breakdown maintenance of hp/lp valves/safety valves, routine deslagging/soot removal and prive/breakdown maintenance of wall blowers lrsb of boiler and other associated work of boiler of unit no. 5 6, 2x250 mw, ctps, parichha, jhansi
Prive/breakdown maintenance of hp/lp valves/safety valves, routine deslagging/soot removal and prive/breakdown maintenance of wall blowers lrsb of boiler and other associated work of boiler of unit no. 5 6, 2x250 mw, ctps, parichha, jhansi
Read moreSupply of aph soot blowers assemblies for stage ii boiler tanda
Supply of aph soot blowers assemblies for stage ii boiler tanda
Read moreRoutine breakdown capital maintenance work of electrical system of esp and soot blowers of sstps unit 1 to 6 at sstps suratgarh
Routine breakdown capital maintenance work of electrical system of esp and soot blowers of sstps unit 1 to 6 at sstps suratgarh
Read moreof your Industry type