Tender Details

Particulars Details
Title
Rubberized Weight Dumbbells,Rubberized Weight Dumbbells,Rubberized Weight Dumbbells,Rubberized Weig
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/3648817
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date July 08, 2023 19:15
End Date
Expired 18/07/2023

Expired 1182 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 5 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Air Force

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 BANSAL SPORTS Make : Aerofit Model : S17607 18-07-2023 13:54:13 MII Qualified
2 Dayal Traders Make : Aerofit Model : S17607 18-07-2023 08:26:45 MII Qualified
3 INDIA ENTERPRISES Make : FIVE RINGS SPORTS Model : FR-5011D 12-07-2023 19:13:09 MII Qualified
4 omkara sports Make : FIVE RINGS SPORTS Model : FR-5011D 17-07-2023 18:55:02 MII Qualified
5 SACHDEV SPORTS COMPANY PRIVATE LIMITED Make : Aerofit Model : S17607 14-07-2023 15:15:48 MII Qualified
6 UNITED MARKETING SPORTS EMPORIUM Make : United Sports Emporium Model : UTDDB2K 18-07-2023 14:01:06 MII MSE Disqualified
Similar Tenders
Supply and fixing of rubberized speed breaker opp. kapra circle office in ward no.15, dr. a.s. rao nagar in kapra circle-7, mmc(rs.4.00 lakhs)

Supply and fixing of rubberized speed breaker opp. kapra circle office in ward no.15, dr. a.s. rao nagar in kapra circle-7, mmc(rs.4.00 lakhs)

Read more
Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years

Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years

Read more
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Read more
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of

Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger

Read more
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Read more
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise