Tender Details
About Tender
🏭 Erection And Dismantling Services For Poles And Oh Lines 🔌 Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Erection And Dismantling Of Poles And Overhead (Oh) Lines From Sayal 11 Kv Substation To Tipla Siding Substation Under The Urimari Open Cast Project (Ocp). 📅 Bid Submission Deadline: June 17, 2024, 5:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 108,000. Detailed Proposals, Including Methodology, Timelines, And Pricing, Are To Be Submitted In Accordance With The Project Specifications. Keywords: Erection And Dismantling, Poles And Oh Lines, Central Coalfields Limited, Public Sector Undertaking, Infrastructure Project, Tender, Bid, Urimari OcpParticulars | Details |
---|---|
Title |
Erection And Dismantling Of Poles And Oh Lines From Sayal 11 Kv Substation To Tipla Siding Substation Under Urimari Ocp.
|
Description |
Erection And Dismantling Of Poles And Oh Lines From Sayal 11 Kv Substation To Tipla Siding Substation Under Urimari Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309938_1 |
Reference Number |
PE(EnM)/Urimari/e Tender/24-25/06 |
Tender Fee | 0 |
EMD | 10800 |
Tender Value | |
Place | Urimari OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321133 |
Start Date | June 07, 2024 15:30 |
End Date |
17/06/2024 ( Expired 354 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreConstruction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipment/mate rials, erection (including civil works), testing and commissioning.
Construction of&#x0d 132/33 kv, 2x50 mva&#x0d gis substation at&#x0d hathi bhata&#x0d (ajmer)&#x0d alongwith&#x0d associated&#x0d transmission&#x0d lines including&#x0d survey, supply&#x0d of all&#x0d equipment/mate&#x0d rials, erection&#x0d (including civil&#x0d works), testing&#x0d and&#x0d commissioning.
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreWork of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.&#x0d
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreRehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Read moreSpecial repairs to internal water supply lines in bldg no. p-83 to p-89 and provn of hardstanding with interlocking paver block in front of bldg no 790 mount road under ge chennai
Special repairs to internal water supply lines in bldg no. p-83 to p-89 and provn of hardstanding with interlocking paver block in front of bldg no 790 mount road under ge chennai
Read moreReplacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Replacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Read moreof your Industry type