Overhauling Of 415 V, 2000 A/3200 A Size Busbars In Bus Duct
|
| Description |
|
| Organisation | Department of Electronics and Information Technology | Ministry of Electronics and Information Technology |
| Tender Id | GEM/2023/B/4382681 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 01, 2024 15:10 |
| End Date |
Expired
12/01/2024
Expired 1005 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ZENETH ENGINEERS
149800
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ZENETH ENGINEERS | Make : NA Model : Unbranded Title : Overhauling of 415V, 2000A/3200A size Busbars in bus duct | 20-01-2024 10:10:55 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ZENETH ENGINEERS(MII) | Item Categories : Overhauling of 415V, 2000A/3200A size Busbars in bus duct | 149800.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Overhauling of 415V, 2000A/3200A size Busbars in bus duct | NA | Unbranded | 100 | ₹ 149800.000 |
Procurement of rubber bellow for generator bus duct main run and tap off run
Procurement of rubber bellow for generator bus duct main run and tap off run
Read moreC&s make acb 2500a 415v 3p, ah-25d-cs in 2500a, ue 415v, ui 1000v, icu: ics: 50ka icw(1s) : 50ka,c&s make acb 3200a 415v 3p, ah-30d-cs in 2500a, ue 415v, ui 1000v, icu: ics: 65ka icw(1s) : 65ka,c&s air circuit breaker ah 40d cs, in: 4000a, ue 415 v breaking capacity at 415 v, icu 100ka, ics 1
C&s make acb 2500a 415v 3p, ah-25d-cs in 2500a, ue 415v, ui 1000v, icu: ics: 50ka icw(1s) : 50ka,c&s make acb 3200a 415v 3p, ah-30d-cs in 2500a, ue 415v, ui 1000v, icu: ics: 65ka icw(1s) : 65ka,c&s air circuit breaker ah 40d cs, in: 4000a, ue 415 v breaking capacity at 415 v, icu 100ka, ics 1
Read moreProcurement of silica gel for transformers and bus duct at dharasu power house, mb-ii, chinyalisaur, uttarkashi.
Procurement of silica gel for transformers and bus duct at dharasu power house, mb-ii, chinyalisaur, uttarkashi.
Read moreSupply of 15.75 kv bus duct rubber bellows for 250 mva generator transformers and 16 mva unit auxiliary transformers
Supply of 15.75 kv bus duct rubber bellows for 250 mva generator transformers and 16 mva unit auxiliary transformers
Read moreProcurement of seal off bushings for bus duct of generator transformer, uat, pt cubicle, and ngt for 2x600mw, sstpp, mppgcl, dongalia.
Procurement of seal off bushings for bus duct of generator transformer, uat, pt cubicle, and ngt for 2x600mw, sstpp, mppgcl, dongalia.
Read moreTtps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Read moreCustom bid for services - bmc for aph, esp, fans, duct- damper and overhauling of fans (2x250 mw) units of nspcl-bhilai expansion plant (2026-28).
Custom bid for services - bmc for aph, esp, fans, duct- damper and overhauling of fans (2x250 mw) units of nspcl-bhilai expansion plant (2026-28).
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara overhauling of main boiler viz overhauling of drum deaerator ibd cbd tanks replacement of coal nozzle assembly and fi elbows repair of duct and damp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara overhauling of main boiler viz overhauling of drum deaerator ibd cbd tanks replacement of coal nozzle assembly and fi elbows repair of duct and damp..
Read moreTtps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Read moreSupply of manpower, t and p, consumables and transportation for periodical, preventive, breakdown and shutdown maintenance and annual overhauling of 6.6kv and 415v ac switchgears, 220v and 24v dc power supply systems, esp control panels and
Other local control panels and associated equipments, battery banks, battery chargers, local push button stations and power receptacles, ht and lt power and control cables installed at various locations under switchgear mtc. cell sgmc, ghtp.
Read moreof your Industry type