Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying /Dismantling /Rearrangement Of 8, 6 And 4 Inch Ms/Gi Pipe Lines And Dismantling, Shifting And Installation Of Pump For A Period Of 01 Years At Baroud Ocm, Of Secl, Raigarh Area.
|
| Description |
Laying /Dismantling/ Rearrangement Of 8, 6 And 4 Inch Ms/Gi Pipe Lines And Dismantling, Shifting And Installation Of Pump For A Period Of 01 Years At Baroud Ocm, Of Secl, Raigarh Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_333567_1 |
|
Reference Number |
SECL/GM/RGH/EnM/e-Tender /24-25/37 dtd 31.03.2025 |
| Tender Fee | 0 |
| EMD | 1.23 Lakh |
| Tender Value | - |
| Place | Raigarh Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345833 |
| Start Date | April 01, 2025 15:30 |
| End Date |
Expired
16/04/2025
Expired 549 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at kasauli under ge kasauli
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at kasauli under ge kasauli
Read moreRepair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at dagshai under ge kasauli
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at dagshai under ge kasauli
Read moreRepair/maintenance of external water supply distribution lines ci/gi/di pipes/ms with repair maintenance of submersible motor/bore well starters and fire fighting equipments etc at dmrl, rcma, atc devatallagutta, dsc lines amcc bldg areas under ge
Repair/maintenance of external water supply distribution lines ci/gi/di pipes/ms with repair maintenance of submersible motor/bore well starters and fire fighting equipments etc at dmrl, rcma, atc devatallagutta, dsc lines amcc bldg areas under ge
Read moreShifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Shifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreGek 89 of 2026-27 - repair replacement of gi ms pipe lines of various sizes, sluice valve, valve pits and other misc work for spring area at dagshai under ge kasauli
Repair replacement of gi ms pipe lines of various sizes, sluice valve, valve pits and other misc work for spring area at dagshai under ge kasauli
Read moreComprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Read moreHammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Read moreLaying/ dismantling /rearrangement of 6 inch and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at bijari ocm, of secl, raigarh area.
Laying/ dismantling/rearrangement of 6 inch and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at bijari ocm, of secl, raigarh area.
Read moreDay to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.
Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.
Read moreof your Industry type