Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work For Various Maintenance Of Various Sub Station Under Edd I And Ii Fatehpur
|
| Description |
Work For Various Maintenance Of Various Sub Station Under Edd I And Ii Fatehpur
|
| Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
| Tender Id | 2024_PVVNV_979877_1 |
|
Reference Number |
48/EDCF/Work/2024-25 |
| Tender Fee | 1180 |
| EMD | 7500 |
| Tender Value | - |
| Place | Fatehpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1723835 |
| Start Date | December 04, 2024 14:30 |
| End Date |
Expired
10/12/2024
Expired 647 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreProcurement of di(k7) pipes as and ts for the month of april-2026 to june-2026 to sub division-ii at hydernagar stores under central stores division.estimate no.est-hdn-202600075
Procurement of di(k7) pipes as and ts for the month of april-2026 to june-2026 to sub division-ii at hydernagar stores under central stores division.estimate no.est-hdn-202600075
Read moreProcurement of di(k7) pipes as and ts for the month of april-2026 to june-2026 to sub division-ii at hydernagar stores under central stores division.estimate no.est-hdn-202600074
Procurement of di(k7) pipes as and ts for the month of april-2026 to june-2026 to sub division-ii at hydernagar stores under central stores division.estimate no.est-hdn-202600074
Read moreWidening strengthening and maintenance of selected r and bd roads in the sangareddy 3 package in telangana under hybrid annuity mode phase i package 27 (2nd call)
Widening strengthening and maintenance of selected r and bd roads in the sangareddy 3 package in telangana under hybrid annuity mode phase i package 27 (2nd call)
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreCarry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027
Carry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreWork for various maintenance work under edd-i and ii, fatehpur
Work for various maintenance work under edd-i and ii, fatehpur
Read moreof your Industry type