Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 1st Floor Over Ftp 5 Control Room For Central Scada System Inside Smelter Plant.
|
Description |
Construction Of 1st Floor Over Ftp 5 Control Room For Central Scada System Inside Smelter Plant.
|
Organisation | National Aluminium Company Limited,NALCO | Central Govt. Ministry/Department |
Tender Id | 2024_NALCO_831697_1 |
Reference Number |
OMC-5870 |
Tender Fee | 0 |
EMD | 20000 |
Tender Value | |
Place | INSIDE SMELTER PLANT NALCO ANGUL |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=873964 |
Start Date | October 21, 2024 18:30 |
End Date |
05/11/2024 ( Expired 193 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreJp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConstruction of proposed 49 tpd municipal waste processing plant ... other ancillary works for proposed 49 tpd municipal waste processing plant under swatch bharat mission within nabadwip municipality.
Construction of proposed 49 tpd municipal waste processing plant ... other ancillary works for proposed 49 tpd municipal waste processing plant under swatch bharat mission within nabadwip municipality.
Read moreConstruction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Construction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreof your Industry type