Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dewatering And Silt Cleaning From Station Drainage Pit And Draft Dewatering Pit Inside Power House Using Submersible Pumps At Power Station I Of Teesta Canal Fall Hydel Project In The District Of Darjeeling.
|
| Description |
Dewatering And Silt Cleaning From Station Drainage Pit And Draft Dewatering Pit Inside Power House Using Submersible Pumps At Power Station I Of Teesta Canal Fall Hydel Project In The District Of Darjeeling.
|
| Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
| Tender Id | 2025_WBSED_855461_1 |
|
Reference Number |
TCFHP/e-Tender/2025-26/06 dtd 30.05.2025 |
| Tender Fee | 0 |
| EMD | 6723 |
| Tender Value | - |
| Place | Power Station I Teesta Canal Fall Hydel Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1914930 |
| Start Date | June 05, 2025 17:30 |
| End Date |
Expired
16/06/2025
Expired 483 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Limited e-tender notice for insurance of teesta canal fall hydel power project of wbsedcl
As per nit
Read moreLimited e-tender notice for insurance of 10mw teesta canal fall hydel power project of wbsedcl
Fire stfi eq terrorism and machinery breakdown
Read moreProcurement of goodwin dewatering pumps for pt sludge pit and ct basin
Procurement of goodwin dewatering pumps for pt sludge pit and ct basinat ntpc barh stpp
Read moreDesign engineering manufacture testing at manufacturers works supply delivery of 3 ph copper wound oil immersed 33kv earthing transformers for teesta canal fall hydel project under wbsedcl
Design engineering manufacture testing at manufacturers works supply delivery of 3 ph copper wound oil immersed 33kv earthing transformers for teesta canal fall hydel project under wbsedcl
Read moreSupply including testing at manufacturers works delivery and unloading of 120kv 10ka station class iii gapless lightning arresters at tcfhp store o and m division i teesta canal fall hydel project under wbsedcl
Supply including testing at manufacturers works delivery and unloading of 120kv 10ka station class iii gapless lightning arresters at tcfhp store o and m division i teesta canal fall hydel project under wbsedcl
Read moreConstruction of 3 nos. 132kv by 110v pt foundations and 3 nos. 132kv isolator foundations alongwith a supporting structure at each of the 132 kv switchyard of power station i, ii, iii of teesta canal fall hydel project.
Construction of 3 nos. 132kv by 110v pt foundations and 3 nos. 132kv isolator foundations alongwith a supporting structure at each of the 132 kv switchyard of power station i, ii, iii of teesta canal fall hydel project.
Read moreOperation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required
Operation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04
 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required
Read moreOperation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required.
Operation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required.
Read moreOperation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required.
Operation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04
 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required.
Read moreOperation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required
Operation of pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at sitapatore mine. (04
 manpower in 1st shift and 04 manpower in 2nd shift )total 08 manpower is required
Read moreof your Industry type