Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Painting Of 315 Mva Gt 5, 40 Mva St 3 And St 4, 20 Mva Uat 5 A And Uat 5 B Under Emoph, Stps During U 5 Oh In December 2025.
|
| Description |
Painting Of 315 Mva Gt 5, 40 Mva St 3 And St 4, 20 Mva Uat 5 A And Uat 5 B Under Emoph, Stps During U 5 Oh In December 2025.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_859330_1 |
|
Reference Number |
WBPDCL/STPS/NIT/E4088/25-26 |
| Tender Fee | 0 |
| EMD | 16686 |
| Tender Value | - |
| Place | AdBldg. STPS, Purulia-723146 |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1927516 |
| Start Date | June 11, 2025 16:30 |
| End Date |
Expired
25/06/2025
Expired 480 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Various maintenance works of transformers gt-6, uat- 6a and 6b, st-5 and st-1 under emoph, stps during upcoming overhauling of u-6.
Various maintenance works of transformers gt-6, uat- 6a and 6b, st-5 and st-1 under emoph, stps during upcoming overhauling of u-6.
Read moreOverhaul maintenance of 20mva, 16.5/6.9kv unit auxiliary transformer -5b (sl. no. 2017186) under emoph, stps.
Overhaul maintenance of 20mva, 16.5/6.9kv unit auxiliary transformer -5b (sl. no. 2017186) under emoph, stps.
Read moreProcurement of neoprene rubber bellows of gt, uat and st bus ducts required under em-oph,stps.
Procurement of neoprene rubber bellows of gt, uat and st bus ducts required under em-oph,stps.
Read moreTtps es circle em iii unit v inspection and arresting of oil leak in lv neutral bushing in 16 mva 15 75 kv 7 kv unit auxiliary transformer 5a and improvement of lectric strength of transformer oil by hot oil circulation in uat 5a 5b and ust 5a 5b
Ttps es circle em iii unit v inspection and arresting of oil leak in lv neutral bushing in 16 mva 15 75 kv 7 kv unit auxiliary transformer 5a and improvement of lectric strength of transformer oil by hot oil circulation in uat 5a 5b and ust 5a 5b
Read moreOverhauling service contract for gt and uat bus duct insulator cleaning and checking in u4,u1,u2 during respective unit oh under emiph and emoph side,bktpp
Overhauling service contract for gt and uat bus duct insulator cleaning and checking in u4,u1,u2 during respective unit oh under emiph and emoph side,bktpp
Read moreOverhauling service contract for gt and uat bus duct insulator cleaning and checking in u4,u1,u2 during respective unit oh under emiph and emoph side, bktpp
Overhauling service contract for gt and uat bus duct insulator cleaning and checking in u4,u1,u2 during respective unit oh under emiph and emoph side, bktpp
Read moreProcurement of transformer oil for gt st uat top up transol ehv grade transformer oil as per is 335 1993 make m s savita oil technology
Procurement of transformer oil for gt st uat top up transol ehv grade transformer oil as per is 335 1993 make m s savita oil technology
Read moreSupply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Supply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Read moreNctps i es circle em i dn s dn i charges for vacuum pulling oil filling and hot oil circulation main tank radiators combined circulation up to reaching of parameters to the satisfactory level in gt st uat of all three units during the per
Nctps i es circle em i dn s dn i charges for vacuum pulling oil filling and hot oil circulation main tank radiators combined circulation up to reaching of parameters to the satisfactory level in gt st uat of all three units during the per
Read moreof your Industry type