Tender Details

Particulars Details
Title
Nit For Supply Of Bo S (Except Spv Modules And Inverters), Installation Commissioning And 5 Years Comprehensive Maintenance Of 100 K Wp Grid Connected Spv Power Plant At Vaikom, Dist Kottayam, Kerala
Description
Nit For Supply Of Bo S (Except Spv Modules And Inverters), Installation Commissioning And 5 Years Comprehensive Maintenance Of 100 K Wp Grid Connected Spv Power Plant At Vaikom, Dist Kottayam, Kerala
Organisation Rajasthan Electronics and Instruments Limited | Central Govt. Ministry/Department
Tender Id 2024_REIL_796321_1
Reference
Number
REIL/RE/23-24/27
Tender Fee 0
EMD 0
Tender Value
Place REIL JAIPUR
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=837059
Start Date February 19, 2024 22:25
End Date

07/03/2024 ( Expired 433 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Read more
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania

Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania

Read more
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis

Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis

Read more
Supply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr

Supply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr

Read more
Up gradation and modernization of ftii pune (sub head: sitc of 100 kwp on grid solar photovoltaic power plant for auditorium cum knowledge center with net metering)

Up gradation and modernization of ftii pune (sub head: sitc of 100 kwp on grid solar photovoltaic power plant for auditorium cum knowledge center with net metering)

Read more
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.

Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise