Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication, Erection And Repairing Of Mother Plate And Liner Plate Of Transfer B/C, Receiving Pyjama Chute, Transfer B/C Discharge Chute, Screen Discharge Chute, Changing Of Rail Between By Pass And Picking Conveyor Etc. Work In Pch Section Of Sawan
|
Description |
Fabrication, Erection And Repairing Of Mother Plate And Liner Plate Of Transfer B/C, Receiving Pyjama Chute, Transfer B/C Discharge Chute, Screen Discharge Chute, Changing Of Rail Between By Pass And Picking Conveyor Etc. Work In Pch Section Of Sawan
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309569_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/21 Date 01.06.2024 |
Tender Fee | 0 |
EMD | 3700 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320763 |
Start Date | June 03, 2024 16:30 |
End Date |
12/06/2024 ( Expired 374 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit
(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit
Read moreFabrication and erection of stair and railing its channel, angle and plate etc of screen floor level of section no. 1 in the fine coal section of kathara washery
Fabrication and erection of stair and railing its channel, angle and plate etc of screen floor level of section no. 1 in the fine coal section of kathara washery
Read moreA)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
Read moreFabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Fabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery
Read moreRepairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Repairing and overhauling of by pass b/c gear box radicon make u-800, reversible and a side shuttle conveyor make radicon u-600 and rom b/c premium make cbhz-320 in pch section at sawang washery.
Read moreRepairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Repairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Read moreRepairing, changing and overhauling of 471 screens discharge chute, flap gate and screen underflow catch pan (tray) and its supporting structure in fine coal section of kathara washery
Repairing, changing and overhauling of 471 screens discharge chute, flap gate and screen underflow catch pan (tray) and its supporting structure in fine coal section of kathara washery
Read moreFabrication/erection of hood/protective cover of rom b/c, picking b/c, reversible b/c and replacement and repairing of skirt rubber frame of bypass b/c and traverse b/c in pch section at sawang washery.
Fabrication/erection of hood/protective cover of rom b/c, picking b/c, reversible b/c and replacement and repairing of skirt rubber frame of bypass b/c and traverse b/c in pch section at sawang washery.
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreof your Industry type