Tender Details
Particulars | Details |
---|---|
Title |
Invitation To Pre Tender Meet For Appointment Of Architectural And Engineering Consultants For Development Of Iit Jammu, Phase B
|
Description |
Invitation To Pre Tender Meet For Appointment Of Architectural And Engineering Consultants For Development Of Iit Jammu, Phase B
|
Organisation | Engineers India Limited,MoPNG | Central Govt. Ministry/Department |
Tender Id | 2025_EIL_856134_1 |
Reference Number |
INVITATION TO PRE-TENDER MEET FOR APPOINTMENT OF ARCHITECTURAL AND ENGINEERING CONSULTANTS |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | As Per Enclosure |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=900099 |
Start Date | April 09, 2025 16:30 |
End Date |
16/04/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreOne time repair of 04 nos. of high pressure jet cleaning machines make karcher at rcnk snp
For complete deion and other details, please refer to tender
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreSupply, installation and commissioning of software and database for simulating the precipitation kinetics at dept. of metallurgical engg., iit(bhu) varanasi.
Tender for supply, installation and commissioning of software and database for simulating the precipitation kinetics at dept. of metallurgical engg., iit(bhu) varanasi.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreConsultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Consultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Read moreof your Industry type