Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Of Manihari Jakhania Faddopur Marg Ch. 0.000 To 14.000 In Distt Ghazipur. Under Pandit Deen Dayal Yojna (With 5 Year Maintenance)
|
Description |
Widening And Strengthening Of Manihari Jakhania Faddopur Marg Ch. 0.000 To 14.000 In Distt Ghazipur. Under Pandit Deen Dayal Yojna (With 5 Year Maintenance)
|
Organisation | Chief Engineer PWD Varanasi Zone | State Govt. and UT |
Tender Id | 2024_CEUVZ_975377_1 |
Reference Number |
81/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024 |
Tender Fee | 5590 |
EMD | 37.68 Lakh |
Tender Value | |
Place | JAUNPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1718629 |
Start Date | November 27, 2024 23:30 |
End Date |
10/12/2024 ( Expired 133 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreTreatment of 05 nos. of landslide location (ch. 29.010 to 29.280, ch.54.840 to 54.980, ch. 56.050 to 56.140) on nh-107 and ch.70.260 to 70.340, ch.81.900 to 82.015 on nh-107a in the state of uttarakhand under annual plan 2024-2025
Treatment of 05 nos. of landslide location (ch. 29.010 to 29.280, ch.54.840 to 54.980, ch. 56.050 to 56.140) on nh-107 and ch.70.260 to 70.340, ch.81.900 to 82.015 on nh-107a in the state of uttarakhand under annual plan 2024-2025
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreCe/eap/adrhardp/corr_i/pkg.3 upgradation and 4_year maintenance of corridor1 from km 98.000_thaiplungdisa to km 122.000_dikrangso
Package no. ce/eap/adrhardp/corr_i/pkg.3&#x0d upgradation and 4-year maintenance of corridor_1 from km 98.000 (thaiplungdisa) to km 122.000_dikrangso_excluding the section from km 100.950 to km 105.400_4.450 km under adrhardp&#x0d
Read moreof your Industry type