Tender Details

Particulars Details
Title
Shifting Of Water Supply Pipeline Coming Under The Alignment Of State Highway From Khanvel To Kherdi Border
Description
Shifting Of Water Supply Pipeline Coming Under The Alignment Of State Highway From Khanvel To Kherdi Border
Organisation UT Administration of Dadra and Nagar Haveli | State Govt. and UT
Tender Id 2024_UTDNH_7276_1
Reference
Number
E TENDER NOTICE NUMBER 16 OF 2024-2025
Tender Fee 1000
EMD 1.2 Lakh
Tender Value
Place DNH Silvassa
Link
View Original Tender Notice

https://dnhtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=7452

Start Date October 01, 2024 23:00
End Date
Expired 08/10/2024

Expired 633 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Read more
To develop a comprehensive integrated scheme of water supply arrangement through pipeline network and related electrical and mechanical of line-10 and derawal nagar to r k ashram marg section of line-8 ext. of delhi mrts project of phase-iv.

To develop a comprehensive integrated scheme of water supply arrangement through pipeline network and related electrical and mechanical of line-10 and derawal nagar to r k ashram marg section of line-8 ext. of delhi mrts project of phase-iv.

Read more
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp

Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp

Read more
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.

Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.

Read more
Laying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.

Laying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.

Read more
Repairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington

Repairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington

Read more
Repair/maint of water main pipeline, sluice valves, arvs, valve pits, nrvs and dosing systems at various distributions pump houses with allied works under ge (utilities) udhampur

Repair/maint of water main pipeline, sluice valves, arvs, valve pits, nrvs and dosing systems at various distributions pump houses with allied works under ge (utilities) udhampur

Read more
Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.

Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise