Tender Details
Particulars | Details |
---|---|
Title |
Package No.Ap20 Xi0905,L068 Road From Muliguda R And B Road At Gorada 15 By 8 Km To Vallada In G.L.Puram Mandal Of Parvathipuram Manyam District. (Balance Work From Km 0 To 2 By 250 Km) ( 3rd Call)
|
Description |
Package No. Ap20 Xi0905, L068 Road From Muliguda R And B Road At Gorada 15 By 8 Km To Vallada In G.L.Puram Mandal Of Parvathipuram Manyam District. (Balance Work From Km 0 To 2 By 250 Km) Est. Cost Rs. 116.83 Lakhs And Rs. 12.49 Lakhs For Routine M
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id | 2025_ENCPR_139939_1 |
Reference Number |
NIT No.18/ 2024-25, Dt.07.03.2025 of the Superintending Engineer, PR Circle, Vizianagaram. |
Tender Fee | 0 |
EMD | 1.85 Lakh |
Tender Value | |
Place | Vallada in G L Puram Mandal of PVP Manyam Dist. |
Link | https://pmgsytendersap.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218495 |
Start Date | March 18, 2025 15:30 |
End Date |
25/03/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreRepair and maintenance of rural road through emarg from deuli adalabarh to krishnajiban chak within sabang block in the district of paschim medinipur. package no. wb20mtn079 length 2.25 km
Repair and maintenance of rural road through emarg from deuli adalabarh to krishnajiban chak within sabang block in the district of paschim medinipur. package no. wb20mtn079 length 2.25 km
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read morePeriodical renewal to lead road to erajpally road from km 0/0 to 2/150 in nizamabad district. (sub work- providing road safety interventions)
Periodical renewal to lead road to erajpally road from km 0/0 to 2/150 in nizamabad district. (sub work- providing road safety interventions)
Read morePeriodical renewals to mosra to bodhan road from km 0/0 to 9/0 in nizamabad district. (sub work- providing road safety interventions)
Periodical renewals to mosra to bodhan road from km 0/0 to 9/0 in nizamabad district. (sub work- providing road safety interventions)
Read moreFdr to restoration of damaged divider on kazipet to peddammagadda road at km 2/6 - 8/2 in hanumakonda district (3rd call)
Fdr to restoration of damaged divider on kazipet to peddammagadda road at km 2/6 - 8/2 in hanumakonda district (4th call)
Read moreGaridhura-mirik-simanabusty road from chainage 5.50 km to 13.95 km, road safety measure work
Garidhura-mirik-simanabusty road from chainage 5.50 km to 13.95 km, road safety measure work under darjeeling highway division in the district of darjeeling during the year 2025-26
Read moreZone 1 uttara room no. 55 durga 8. nagar road construction work by interlocking tiles in the drain from jog shah house to vinod yadav house.
Zone 1 uttara room no. 55 durga 8. nagar road construction work by interlocking tiles in the drain from jog shah house to vinod yadav house.
Read moreA/r m/o narag wasni dinger road km 0/0 to 17/500 and a/r m/o chourighat sarsoo road km 0/0 to 4/0 (sh- p/l patch work in km 0/00 to 1/0 and 10/00 to 14/00 , p/l patch work in km 0/00 to 2/00)
A/r m/o narag wasni dinger road km 0/0 to 17/500 and a/r m/o chourighat sarsoo road km 0/0 to 4/0 (sh- p/l patch work in km 0/00 to 1/0 and 10/00 to 14/00 , p/l patch work in km 0/00 to 2/00)
Read moreof your Industry type