Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Labour For Removal Of Floating Material And Silt In Front Of Shiv Mandir At Rameshwar Ghat Nala Under Ward 13 Zone 4.
|
Description |
Supply Of Labour For Removal Of Floating Material And Silt In Front Of Shiv Mandir At Rameshwar Ghat Nala Under Ward 13 Zone 4.
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 23200 |
Tender Value | |
Place | Purana kanpur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 18, 2025 00:20 |
End Date |
27/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreSupply, installation, testing and commissioning of table-top afm/stm system for ambient operation with vibration isolation stage and advanced imaging options
Supply,&#x0d installation, testing and commissioning of table-top afm/stm system for ambient operation with&#x0d vibration isolation stage and advanced imaging options at the department of physics, kannur university (under pm usha scheme)
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreAutomation and upgradation of existing water supply system including outsourcing for monitoring, management and operation of the same at binnaguri mil station under ge (s) binnaguri
Automation and upgradation of existing water supply system including outsourcing for monitoring, management and operation of the same at binnaguri mil station under ge (s) binnaguri
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreConstruction of cc renewel road and rcc drain in front of high school ziyauddin house to noor miyan at ward 14 sironj
Construction of cc renewel road and rcc drain in front of high school ziyauddin house to noor miyan at ward 14 sironj
Read moreof your Industry type