Tender Details

Particulars Details
Title
Renewal Work By Sdbc On Gandikhata Laldhang Road In Constituency Haridwar Gra Distt. Haridwar Under Ar 2025 26 (Km 1, 2, 3)
Description
Renewal Work By Sdbc On Gandikhata Laldhang Road In Constituency Haridwar Gra Distt. Haridwar Under Ar 2025 26 (Km 1, 2, 3)
Organisation PWD | State Govt. and UT
Tender Id 2025_pwd_81565_1
Reference
Number
649/2A Dated 05.03.2025
Tender Fee 4720
EMD 1.34 Lakh
Tender Value
Place Haridwar
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97254
Start Date March 22, 2025 14:30
End Date

31/03/2025 ( Expired 42 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25

Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Read more
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.

Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.

Read more
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Read more
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise