Tender Details
Particulars | Details |
---|---|
Title |
Regular Maintenance Of The Lawns, Hedge Plants, Korean Grass On West Side Of Approach Road Leading To Switchyard 1 For The Period From 01.04.2025 To 31.03.2026
|
Description |
Regular Maintenance Of The Lawns, Hedge&Amp#X0d
Plants, Korean Grass On West Side Of Approach Road Leading To&Amp#X0d
Switchyard 1 For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530801_1 |
Reference Number |
CE SE C TTPS Spec. No 38 25 26 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631895 |
Start Date | March 07, 2025 23:30 |
End Date |
14/03/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreIndependent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreSc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Read moreof your Industry type