Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Nhai Anti Crash Barrier Type Safety Along The Track In Idh Bki Section Under Sr.Den/Ii/Agra Jurisdiction.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78147424 |
|
Reference Number |
2024-Oct-03-11 |
| Tender Fee | 0 |
| EMD | 19.81 Lakh |
| Tender Value | - |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78147424/viewNitPdf_4756034.pdf |
| Start Date | October 26, 2024 00:36 |
| End Date |
Expired
18/11/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of track machine siding under the jurisdiction of sr.den(east)/nagpur.
Provision of track machine siding under the jurisdiction of sr.den(east)/nagpur.
Read moreMaintenance, cleanliness and repair to existing nurseries and green patches at various stations in the jurisdiction of aden/hq/agra and aden-line/idh for 24 months
Maintenance, cleanliness and repair to existing nurseries and green patches at various stations in the jurisdiction of aden/hq/agra and aden-line/idh for 24 months
Read moreProvision of dc track circuit in parallel with existing msdac for dual detection in station yard under the jurisdiction of sr.den/south/kgp.
Provision of dc track circuit in parallel with existing msdac for dual detection in station yard under the jurisdiction of sr.den/south/kgp.
Read morePre and post tamping track measurement survey using trimble gedo vorsys trolley system or similar and development of updated scale map under the jurisdiction of sr.den/1/hwh and sr.den/hq/hwh under hwh division
Pre and post tamping track measurement survey using trimble gedo vorsys trolley system or similar and development of updated scale map under the jurisdiction of sr.den/1/hwh and sr.den/hq/hwh under hwh division
Read moreTrack work in connection with leftover works after yard remodelling/ni work of jnu yard under aden/jnu in the jurisdiction of sr.den-iii/lko.
Track work in connection with leftover works after yard remodelling/ni work of jnu yard under aden/jnu in the jurisdiction of sr.den-iii/lko.
Read morePre & post tamping track measurements using portable track geometry measurement trolley system similar to trimble gedo vorsys trolley system for design mode tamping on all lines under the jurisdiction of sr.den/north/nagpur.
Pre & post tamping track measurements using portable track geometry measurement trolley system similar to trimble gedo vorsys trolley system for design mode tamping on all lines under the jurisdiction of sr.den/north/nagpur.
Read morePrism gedo trolly survey for correction of alignment of track between dw-pnvl,pnvl-jnpt, pnvl-roha, dw-bsr section in jurisdiction of sr.den (e) bb.
Prism gedo trolly survey for correction of alignment of track between dw-pnvl,pnvl-jnpt, pnvl-roha, dw-bsr section in jurisdiction of sr.den (e) bb.
Read moreVijayawada division: bza-gdr section: improvements to pway assets and track for annual gm safety inspection 2026 in aden/ogl sub-division of sr.den/south/bza jurisdiction.
Vijayawada division: bza-gdr section: improvements to pway assets and track for annual gm safety inspection 2026 in aden/ogl sub-division of sr.den/south/bza jurisdiction.
Read moreVijayawada division: bza-gdr section: improvements to pway assets and track for annual gm safety inspection 2026 in aden/nlr sub-division of sr.den/south/bza jurisdiction.
Vijayawada division: bza-gdr section: improvements to pway assets and track for annual gm safety inspection 2026 in aden/nlr sub-division of sr.den/south/bza jurisdiction.
Read moreA- complete track renewal (p) of 12.994 kms with contractors pqrs portal in idh-bxn section under aden-line/agra section.b- agc-dho through sleeper renewal (p) of 24.172 kms with contractors pqrs portal in agc-dho section under aden/dho section
A- complete track renewal (p) of 12.994 kms with contractors pqrs portal in idh-bxn section under aden-line/agra section.b- agc-dho through sleeper renewal (p) of 24.172 kms with contractors pqrs portal in agc-dho section under aden/dho section
Read moreof your Industry type