Tender Details

Particulars Details
Title
Repair And Reconditioning Of Ip Rotor Of 210 Mw Lmw Turbine Released From Unit Iii Ttps As Per The Scope Of Works Enclosed And Renewal Of Blades Including Supply Of Blades And Allied Materials
Description
Repair And Reconditioning Of Ip Rotor Of 210 Mw Lmw Turbine Released From Unit Iii Ttps As Per The Scope Of Works Enclosed And Renewal Of Blades Including Supply Of Blades And Allied Materials
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_467579_1
Reference
Number
CE/TTPS/4023-M
Tender Fee 0
EMD 3.6 Lakh
Tender Value
Place Tuticorin
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=555593
Start Date July 29, 2024 17:30
End Date

29/08/2024 ( Expired 236 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply installation testing and commissioning of a medical grade online reverse osmosis ro plant of 500 liters per hour capacity double pass along with allied works for the hemodialysis unit in sdh bhaderwah on turnkey basis

Supply installation testing and commissioning of a medical grade online reverse osmosis ro plant of 500 liters per hour capacity double pass along with allied works for the hemodialysis unit in sdh bhaderwah on turnkey basis

Read more
Supply, installation, testing and commissioning of a medical grade online double pass reverse osmosis ro plant of 500 liters per hour capacity, double pass along with allied works for the haemodialysis unit in subdistrict hospital, akhnoor on

Supply, installation, testing and commissioning of a medical grade online double pass reverse osmosis ro plant of 500 liters per hour capacity, double pass along with allied works for the haemodialysis unit in subdistrict hospital, akhnoor on

Read more
Design, supply, installation, testing and commissioning of the lightening protection system including material as per design and allied miscellaneous civil and mechanical works at iocl solapur terminal under maharashtra state office

Design, supply, installation, testing and commissioning of the lightening protection system including material as per design and allied miscellaneous civil and mechanical works at iocl solapur terminal under maharashtra state office

Read more
Work of construction of 200mm diameter tube wells in all strata supply and installation of submersible pump sets and other allied works as per financial offer, testing and commissioning with 2 year dlp under phed division alwar(annual rate contract)

Work of construction of 200mm diameter tube wells in all strata supply and installation of submersible pump sets and other allied works as per financial offer, testing and commissioning with 2 year dlp under phed division alwar(annual rate contract)

Read more
Construction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital

Construction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital

Read more
Mtps i bm unit iii boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout coal nozzles fixing of divider plates and allied works

Mtps i bm unit iii boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout coal nozzles fixing of divider plates and allied works

Read more
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Read more
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Mtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Mtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Read more
Click Here to Download Dockets