Tender Details

Particulars Details
Title
Custom Bid For Services Dismantling And Erection Of Ht Overhead Line As And When Required In Fy 2
Description
Organisation COAL INDIA LIMITED | Ministry of Coal
Tender Id GEM/2025/B/6478525
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 26, 2025 23:04
End Date
Expired 06/08/2025

Expired 432 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Amitava Maity
Ministry: Ministry Of Coal
Department: Coal India Limited
Organisation: Western Coalfields Limited
Similar Tenders
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Read more
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27

Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27

Read more
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Read more
Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)

Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
At katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-

At katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.

Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.

Read more
Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.

Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise