Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Dismantling And Erection Of Ht Overhead Line As And When Required In Fy 2
|
| Description |
|
| Organisation | COAL INDIA LIMITED | Ministry of Coal |
| Tender Id | GEM/2025/B/6478525 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 26, 2025 23:04 |
| End Date |
Expired
06/08/2025
Expired 432 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreKtps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreShifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreAt katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-
At katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreKtps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Read moreExpression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Read moreof your Industry type