Tender Details
Particulars | Details |
---|---|
Title |
Torque Screw Driver For Bits 1/4" (0.5 To 2.5 Nm),Varnish Mespoulet,Sealent
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5979151 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 22, 2025 15:30 |
End Date |
15/03/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreHiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreDetailed project report (dpr) for 2-4-laning from km 0.00 to km 27.00 i.e. karnataka border to
Detailed project report (dpr) for 2-4-laning from km 0.00 to km 27.00 i.e. karnataka border to
 sanquelim section (27 km) of nh-748aa in the state of goa
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreLed light type 1,led light type 2,led light type 3,led light type 4,led light driver type 1,led lig
Read more
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreof your Industry type