Particulars | Details |
---|---|
Title |
Partial Repairing Reconditioning Of 3.3 Kv Dol Starter Nflp Type Make Sait Teknik Pvt Ltd Installed For 2000 Gpm Pump Operation Under Dakra Ocp, Nk Area.
|
Description |
Partial Repairing Reconditioning Of 3.3 Kv Dol Starter Nflp Type Make Sait Teknik Pvt Ltd Installed For 2000 Gpm Pump Operation Under Dakra Ocp, Nk Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_292018_1 |
Reference Number |
PE (EnM)/DBB/eNIT/2023-24/84 |
Tender Fee | |
EMD | 700 |
Tender Value | |
Place | Office of Project Officer Dakra |
Link | https://coalindiatenders.nic.in |
Start Date | October 26, 2023 17:30 |
End Date |
02/11/2023 ( Expired 611 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 3.3kv, 250kw, 1489rpm, marathon make squirrel cage induction motor, sl no 3ff330770/1 pump motor at shyamsundarpur colliery under bankola area
Repairing of 3.3kv, 250kw, 1489rpm, marathon make squirrel cage induction motor, sl no 3ff330770/1 pump motor at shyamsundarpur colliery under bankola area
Read moreRoutine maintenance of 30 numbers of eicher make 5 kva dg set, installed at various locations for illuminating of 16 meter high mast tower lights under magadh ocp, m s area
Routine maintenance of 30 
 numbers of eicher make 5 kva dg set, installed at various locations for illuminating of 16 meter high mast tower lights under magadh ocp, m-s area
Read moreConstruction and installation of 3 no of shed to be installed at filter plant (1no.) for pump er and at quarry no.1 (2 no.) for 2000gpm pump er and switch of pundi project under kuju area
Construction and installation of 3 no of shed to be installed at filter plant (1no.) for pump er and at quarry no.1 (2 no.) for 2000gpm pump er and switch of pundi project under kuju area
Read moreRepairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Repairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Read moreComplete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513
Complete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513
Read moreRepairing the false ceiling and wiring, with some modification of the two-number portable cabin to make it suitable for fitting various bus bars and relay panels to safely control the power supply under magadh ocp, m-s area
Repairing the false ceiling and wiring, with some modification of the two-number portable cabin to make it suitable for fitting various bus bars and relay panels to safely control the power supply under magadh ocp, m-s area
Read moreFor the work of supply of spare parts and repairing of 33 kv and 11 kv vcb of different make installed in the area under eudd-33 kv line, meerut.
For the work of supply of spare parts and repairing of 33 kv and 11 kv vcb of different make installed in the area under eudd-33 kv line, meerut.
Read moreComplete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Complete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Read moreRepairing of 5 stage m and p make 500gpm 150 mtr head pump for iv seam ug pumping under govindpur area
Repairing of 5 stage m and p make 500gpm 150 mtr head pump for iv seam ug pumping under govindpur area
Read moreComplete repairing of 2000 gpm x 100 mtrs head pump single stage kirloskar make of kuya ocp under bastacolla area.
Complete repairing of 2000 gpm x 100 mtrs head pump single stage kirloskar make of kuya ocp under bastacolla area.