Tender Details
Particulars | Details |
---|---|
Title |
Construction Transformer Dp Structure At 5 Locations And Consturction Of Ht Abc At Ambalaparambu Under Electrical Section Mala.
|
Description |
Construction Of New Ht Line Using 120sqmm Ht Abc, Transformer Dp, Dismantling And &Amp#X0d
Transferring Lt Lines For Constructing Transformer Dp Structure At 5 Locations And Construction Of &Amp#X0d
Ht Abc At Ambalaparambu Under Electrical Section Mala
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2025_KSEB_755576_1 |
Reference Number |
TENDER/2024-25/5154/134 dt.25.03.2025 |
Tender Fee | 1888 |
EMD | 19500 |
Tender Value | |
Place | Mala |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1226973 |
Start Date | March 28, 2025 20:30 |
End Date |
22/04/2025 ( Expired 19 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreConstruction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Construction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreRectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode
Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreof your Industry type