Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit Ii Upkeepment, Cleaning Of Mills, Mill Floor And Leak Arresting In Mills And Coal Pipes From Mills To Boiler For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit Ii Upkeepment, Cleaning Of Mills, Mill Floor And Leak Arresting In Mills And Coal Pipes From Mills To Boiler For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526060_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.19/25-26 |
Tender Fee | 0 |
EMD | 23400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=626378 |
Start Date | February 19, 2025 17:30 |
End Date |
04/03/2025 ( Expired 116 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreTtps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Ttps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Read moreTtps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Ttps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Read moreTtps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Read moreTtps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreTtps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Ttps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Read moreMtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and