Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Additional Excavation In Rock Of Underground Section 12th Level South At
|
| Description |
|
| Organisation | MOIL Limited | Ministry of Steel |
| Tender Id | GEM/2024/B/4489709 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 16, 2024 18:14 |
| End Date |
Expired
06/02/2024
Expired 979 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
SHREE BALAJI CONTRACT WORK
4782709
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A K Enterprises | 06-02-2024 11:27:54 | Registered with designated Agency / Authority | MSE | Qualified |
| 2 | S R MANISH KUMAR | 05-02-2024 19:43:54 | MSE | MSE | Qualified |
| 3 | SHREE BALAJI CONTRACT WORK | 06-02-2024 12:00:24 | MSE | MSE | Qualified |
| 4 | SHREE GANESH ENTERPRISES | 06-02-2024 10:58:12 | Registered with designated Agency / Authority | MSE | Qualified |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Custom Bid for Services - Additional excavation in Rock of underground section 12th Level South at Balaghat Mine Quantity as per tender document | Custom Bid for Services | 1 | ₹ 4782709.000 |
Conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl
Conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl
Read moreConversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl
Conversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl
Read moreConversion of existing overhead line to underground cable in begumbazar division in hyderabad south circle of ghmc area of tgspdcl
Conversion of existing overhead line to underground cable in begumbazar division in hyderabad south circle of ghmc area of tgspdcl
Read moreDesign, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreCustom bid for services - additional excavation in rock of underground section 12th level south at
Read more
of your Industry type