Tender Details

Particulars Details
Title
Custom Bid For Services Additional Excavation In Rock Of Underground Section 12th Level South At
Description
Organisation MOIL Limited | Ministry of Steel
Tender Id GEM/2024/B/4489709
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date January 16, 2024 18:14
End Date
Expired 06/02/2024

Expired 979 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

SHREE BALAJI CONTRACT WORK

Contract Value

4782709

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Vinay Vishwanath Wagh
Ministry: Ministry Of Steel
Department: Moil Limited
Organisation: Moil Limited

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 A K Enterprises 06-02-2024 11:27:54 Registered with designated Agency / Authority MSE Qualified
2 S R MANISH KUMAR 05-02-2024 19:43:54 MSE MSE Qualified
3 SHREE BALAJI CONTRACT WORK 06-02-2024 12:00:24 MSE MSE Qualified
4 SHREE GANESH ENTERPRISES 06-02-2024 10:58:12 Registered with designated Agency / Authority MSE Qualified

Ordered Items & Contract Pricing

Service Category Name Ordered Quantity Price
Custom Bid for Services - Additional excavation in Rock of underground section 12th Level South at Balaghat Mine Quantity as per tender document Custom Bid for Services 1 ₹ 4782709.000
Similar Tenders
Conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl

Conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl

Read more
Conversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl

Conversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl

Read more
Conversion of existing overhead line to underground cable in begumbazar division in hyderabad south circle of ghmc area of tgspdcl

Conversion of existing overhead line to underground cable in begumbazar division in hyderabad south circle of ghmc area of tgspdcl

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise