Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvements To Existing Cps At Pugalzenthi Salai In Division 93, Unit 20, Zone Vii
|
| Description |
Improvements To Existing Cps At Pugalzenthi Salai In Division 93, Unit 20, Zone Vii
|
| Organisation | Corporation of Chennai | State Govt. and UT |
| Tender Id | 2024_CoC_409877_1 |
|
Reference Number |
Z.O.VII.C.No.E1/8662/2023 |
| Tender Fee | 0 |
| EMD | 9000 |
| Tender Value | |
| Place | ZONE 7 AMBATTUR |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487640 |
| Start Date | January 13, 2024 20:30 |
| End Date |
Expired
18/01/2024
Expired 913 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreUpgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Upgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreImprovements to existing cps at agathiyar salai in division - 93, unit - 20, zone - vii
Improvements to existing cps at agathiyar salai in division - 93, unit - 20, zone - vii
Read moreof your Industry type