Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Comprehensive Annual Maintenance Contract (Camc) Of 89 Nos. Cctv Camera Along With Associated Nvr Ups Monitors Radio Ofc Equipment S Networking Equipment S Installed At Different Project For A Period Of One Year
|
Description |
Comprehensive Annual Maintenance Contract (Camc) Of 89 Nos. Cctv Camera Along With Associated Nvr Ups Monitors Radio Ofc Equipment S Networking Equipment S Installed At Different Project For A Period Of One Year
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_336059_1 |
Reference Number |
SO(EnM)/B-S/eTender/25-26/266 |
Tender Fee | 0 |
EMD | 23600 |
Tender Value | |
Place | GM Unit |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348352 |
Start Date | May 24, 2025 14:30 |
End Date |
02/06/2025 ( Expired 33 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Comprehensive maintenance contract of oxymat make oxygen generation plant of 280 lpm capacity installed at associated hospital of gmc baramulla for a period of one year (2025-26).
Comprehensive maintenance contract of oxymat make oxygen generation plant of 280 lpm capacity installed at associated hospital of gmc baramulla for a period of one year (2025-26).
Read moreE.l.d.c.no/smii/p5/1995/2025 supply installation and commissioning of 14nos of 5kva diesel generator set with comprehensive annual maintenance contract for a period of 5 years after one year warranty period for 14 nos. of uhwc in gcc zone-10
E.l.d.c.no/smii/p5/1995/2025supply installation and commissioning of 14nos of 5kva diesel generator set with comprehensive annual maintenance contract for a period of 5 years after one year warranty period for 14 nos of uhwc in gcc zone 10
Read moreProposed comprehensive annual maintenance contract for 16 nos of 1.5 ton air conditioner and 10 nos of 2 ton air conditioner units with spare parts for the period of one year at uchc hospital building in dn-194, zone-xv
Proposed comprehensive annual maintenance contract for 16 nos of 1.5 ton air conditioner and 10 nos of 2 ton air conditioner units with spare parts for the period of one year at uchc hospital building in dn-194, zone-xv
Read moreComprehensive annual maintenance contract (camc) including periodic servicing, testing of the water quality from phe dte. along with supply of all consumable materials for different purifier units for a period of 2 years at mjn mch, coochbehar during
Comprehensive annual maintenance contract (camc) including periodic servicing, testing of the water quality from phe dte. along with supply of all consumable materials for different purifier units for a period of 2 years at mjn mch, coochbehar during
Read moreE.l.d.c.no./ smii/ p1/ 610/2025 comprehensive annual maintenance contract for 3 nos of water cooled chiller units in centralized water-cooled hvac system available in ammamaligai ripon building premises for the period of one year in div 58 zone v
Comprehensive annual maintenance contract for 3 nos of water cooled chiller units in centralized water-cooled hvac system available in ammamaligai ripon building premises for the period of one year in div 58 zone v
Read moreComprehensive maintenance contract of pm care (l and t) make oxygen generation plant of 1000 lpm capacity installed at associated hospital of gmc baramulla for a period of one year (2025-26).
Comprehensive maintenance contract of pm care (l and t) make oxygen generation plant of 1000 lpm capacity installed at associated hospital of gmc baramulla for a period of one year (2025-26).
Read moreProviding fitting of control panel along with main drive and allied parts and comprehensive annual maintenance contract camc of 26 passenger 01 no. lift for one year and extendable by subsequent to two years installed at govt. chest diseases hosp
Providing fitting of control panel along with main drive and allied parts and comprehensive annual maintenance contract camc of 26 passenger 01 no. lift for one year and extendable by subsequent to two years installed at govt. chest diseases hosp
Read moreComprehensive annual maintenance contract of ip based cctv surveillance system installed at nigahi project for period of 1 year
Comprehensive annual maintenance contract of ip based cctv surveillance system installed at nigahi project for period of 1 year
Read moreComprehensive maintenance contract of airsep make ogp of 1000 lpm capacity alongwith operation of 01 no. 1000 lpm ogp (airsep make) and 02 no. 1000 lpm ogps (inmatec make) installed at associated hospital of gmc baramulla for a period of one year
Comprehensive maintenance contract of airsep make ogp of 1000 lpm capacity alongwith operation of 01 no. 1000 lpm ogp (airsep make) and 02 no. 1000 lpm ogps (inmatec make) installed at associated hospital of gmc baramulla for a period of one year
Read moreComprehensive annual maintenance contract of (camc) of 58 nos ac installed at different location under m-s area
Comprehensive annual maintenance contract of (camc) of 58 nos ac installed at different location under m-s area
Read moreof your Industry type