Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Road No. 58 A (From Road No. 58 To Road No. 56) Under Sub Division M 2112 Of Shahdara Road Division (M 211) During 2024 25.
|
| Description |
Strengthening Of Road No. 58 A (From Road No. 58 To Road No. 56) Under Sub Division M 2112 Of Shahdara Road Division (M 211) During 2024 25.
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2024_PWD_265393_1 |
|
Reference Number |
10/SE/Shahdara Cir. M/PWD/NIT/2024-25 |
| Tender Fee | 0 |
| EMD | 10.71 Lakh |
| Tender Value | - |
| Place | Executive Engineer, Division M-211, PWD, Delhi |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347942 |
| Start Date | November 27, 2024 21:30 |
| End Date |
Expired
11/12/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road improvement work from cc-47 to cc-58 in ward 56, avantika.
Road improvement work from cc-47 to cc-58 in ward 56, avantika.
Read moreAdvance work at hemmakki sy.no.56 - in mandagadde range during 2026-27 under campa, extent 15.00 ha
Advance work at hemmakki sy.no.56 - in mandagadde range during 2026-27 under campa, extent 15.00 ha
Read moreAdvance work including10x16 seedlings at chimmanchod forest area 25 ha sy.no.58 in chincholi taluka during-2026-27
Advance work including10x16 seedlings at chimmanchod forest area 25 ha sy.no.58 in chincholi taluka during-2026-27
Read moreLaying of distribution water supply pipe line in newly developed areas under different wards of kataka municipal corporation (ward no.56, 57, 58 and 59)
Laying of distribution water supply pipe line in newly developed areas under different wards of kataka municipal corporation (ward no.56, 57, 58 and 59)
Read moreTtps mechii bm unit iiistrengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 20262027
Ttps mechii bm unit iiistrengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 20262027
Read moreDevelopment and strengthening of bailey bridges under the jurisdiction of gonda twisa sub-division, pwd(randb) during the year 2026-27.
Development and strengthening of bailey bridges under the jurisdiction of gonda twisa sub-division, pwd(randb) during the year 2026-27.
Read moreTtps mech ii bm unit v strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof overhaul for the year 2026 2027
Ttps mech ii bm unit v strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof overhaul for the year 2026 2027
Read moreUltraporous acetabular shell with compatible crosslinked polyethylene liner with two screw (size 44/,revision acetabular cup with ischial flange/peripheral rim screws (to include 08 screws) /(size 56/58,posterior stabilised knee consisting of: cobalt chromium femoral component matching highly crosslin
Ultraporous acetabular shell with compatible crosslinked polyethylene liner with two screw (size 44/,revision acetabular cup with ischial flange/peripheral rim screws (to include 08 screws) /(size 56/58,posterior stabilised knee consisting of: cobalt chromium femoral component matching highly crosslin
Read moreAdvance work at hanasa, maradi sy.no.33, 7 - 10 ha , huruli sy.no.46 &56 - 15 ha, muthuvalli & yadamane sy.no.9,11,22 - 25 ha- in agumbe range during 2026-27 under ddf - 50 ha
Advance work at hanasa, maradi sy.no.33, 7 - 10 ha , huruli sy.no.46 &56 - 15 ha, muthuvalli & yadamane sy.no.9,11,22 - 25 ha- in agumbe range during 2026-27 under ddf 50 ha
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreof your Industry type