Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of Main Line Elevated Viaduct From ................Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E And M Works And Peb Structures In Corridor 2 Of Agra Metro At Agra, U.P.
|
Description |
Design And Construction Of Main Line Elevated Viaduct From ................Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E And M Works And Peb Structures In Corridor 2 Of Agra Metro At Agra, U.P.
|
Organisation | Uttar Pradesh Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2023_UPMRC_173702_1 |
Reference Number |
|
Tender Fee | 23600 |
EMD | 30.58 Crore |
Tender Value | |
Place | AGRA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=190314 |
Start Date | February 19, 2024 16:30 |
End Date |
29/02/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreRepair / replacement of lt ug cable / lt outdoor panels main to e/m installation / substation, mccb and connected works and repair / maintenance of fire fighting systems, fire panels / equipment, smoke detectors with allied services at hqtc bangalore
Repair / replacement of lt ug cable / lt outdoor panels main to e/m installation / substation, mccb and connected works and repair / maintenance of fire fighting systems, fire panels / equipment, smoke detectors with allied services at hqtc bangalore
Read moreOperation of pumps including supply of water to vessels and maintenance of fresh water supply and fire fighting line and sanitary works along with other miscellaneous work for a period of one year (2025-2026) inside dock area, hdc, haldia.
Operation of pumps including supply of water to vessels and maintenance of fresh water supply and fire fighting line and sanitary works along with other miscellaneous work for a period of one year (2025-2026) inside dock area, hdc, haldia.
Read moreArchitectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Architectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Read moreDesign and construction of skywalk including peb, architectural finishing and e and m works at anand vihar namo bharat station of delhi-ghaziabad-meerut namo bharat corridor
Design and construction of skywalk including peb, architectural finishing and e and m works at anand vihar namo bharat station of delhi-ghaziabad-meerut namo bharat corridor
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing, fire protection and vac works for 9 underground stations and 10 elevated stations
R.k salai station to sholinganallur station including bored tunnel and viaduct between the stations, cut and cover tunnel, u section and elevated ramp (ch. 17250.000 to ch. 35437.030) for corridor-3 of chennai metro rail project phase ii.
Read moreConstruction of entry exit structure civil works for additional escalators supply installation of fixed glass panel at platform level for corridor 04 elevated stations of phase 2
Construction of entry exit structures closure civil works for additional escalators supply installation of fixed glass panel at platform level for corridor 04 elevated stations of chennai metro rail project phase 2
Read moreWork of development of 24x7 wss in ward 2 of nishat area by way of sdltc of separate pipe network including all work of mech, elec., scada, household connections, consumer water meter fitting--- and associated e-m and civil works at harwan (sarband)
Work of development of 24x7 wss in ward 2 of nishat area by way of sdltc of separate pipe network including all work of mech, elec., scada, household connections, consumer water meter fitting--- and associated e-m and civil works at harwan (sarband)
Read moreElectrification work of multilevel car parking at kashipur udham singh nagar uttrakhand ( sub head e and m works consists of internal electrical installation 13 passanger lift fire fighting system cctv camra dg set automatic boom barrier
Electrification work of multilevel car parking at kashipur udham singh nagar uttrakhand ( sub head e and m works consists of internal electrical installation 13 passanger lift fire fighting system cctv camra dg set automatic boom barrier
Read moreConstruction of 01 no 40 women barrack g plus 1 including internal water supply sanitary installation and development works at bsf campus baikunthpur under shq siliguri sub head structural design
Construction of 01 no 40 women barrack g plus 1 including internal water supply sanitary installation and development works at bsf campus baikunthpur under shq siliguri sub head structural design
Read moreof your Industry type