Tender Details

Particulars Details
Title
Improvements To Kitawade To Dhangarwada Road, Odr No.140, Km. 0/00 To 3/00 In Taluka Ajara, Dist. Kolhapur
Description
Improvements To Kitawade To Dhangarwada Road, Odr No.140, Km. 0/00 To 3/00 In Taluka Ajara, Dist. Kolhapur
Organisation Government of Maharashtra
Tender Id 2023_PWDRP_926538_1
Reference
Number
E Notice No.17 for 2023-24
Tender Fee 1200
EMD 1.08 Lakh
Tender Value
Place Executive Engineer, P.W.(South) Division, Kolhapur
Link https://mahatenders.gov.in
Start Date July 18, 2023 23:30
End Date

01/08/2023 ( Expired 698 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise