Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Spares For Trf Make Ring Granulator And Vibrating Grizzly Feeder 🛠️ Rvunl, Jhalawar, Under The State Govt. And Ut, Has Issued A Tender For The Supply Of Spares For Trf L & T Elecon Mcnally Hewitt Robins Thyssenkrupp Make Ring Granulator And Vibrating Grizzly Feeder Of Chp At Ka Tpp. 📅 Bid Submission Deadline: May 14, 2024, 3:00 Pm Tender Fee: Inr 7900 Emd: Inr 527940 Interested Suppliers Must Provide Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, For The Supply Of High Quality Spares That Meet The Specifications Of The Trf Make Equipment. Keywords: Spares, Trf L & T Elecon Mcnally Hewitt Robins Thyssenkrupp, Ring Granulator, Vibrating Grizzly Feeder, Rvunl, Ka Tpp, Jhalawar, Government Tender, Procurement| Particulars | Details |
|---|---|
| Title |
Supply Of Spares For Trf Make Ring Granulator And Vibrating Grizzly Feeder Of Chp At Katpp, Rvunl, Jhalawar
|
| Description |
Supply Of Trf L Andt Elecon Mcnally Hewittrobins Thyssenkrupp Make Spares For Trf Make Ring Granulator And Vibrating Grizzly Feeder Of Chp
|
| Organisation | RRVUN - CMD | State Govt. and UT |
| Tender Id | 2024_RRVUN_382780_1 |
|
Reference Number |
TN-1116(MM) |
| Tender Fee | 7900 |
| EMD | 5.28 Lakh |
| Tender Value | - |
| Place | KaTPP,RVUNL,Jhalawar |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=681673 |
| Start Date | February 26, 2024 17:30 |
| End Date |
Expired
14/05/2024
Expired 882 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of coal concentrator for boiler, 2x600 mw katpp, rvunl, jhalawar
Supply of coal concentrator for boiler, 2x600 mw katpp, rvunl, jhalawar
Read moreProviding store facility for chp at katpp plant site, jhalawar.
Providing store facility for chp at katpp plant site, jhalawar.
Read moreSupply of erw ms pipes fittings for fire fighting system at katpp,rvunl jhalawar
Supply of erw ms pipes fittings for fire fighting system at katpp,rvunl jhalawar
Read moreSupply of screen plates for vibrating grizzly feeders required in mm-ii sub division of mm/chp/btps
Supply of screen plates for vibrating grizzly feeders required in mm-ii sub division of mm/chp/btps
Read moreSupply of complete apron chain and inner block apron chain links for coal handling plant at katpp, rvunl, jhalawar
Supply of complete apron chain and inner block apron chain links for coal handling plant at katpp, rvunl, jhalawar
Read moreRequirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Read moreToothed hammer ring. as per drg. no: chp/olc-2/001 (suitable for elecon make ring granulator) , model
Toothed hammer ring. as per drg. no: chp/olc-2/001 (suitable for elecon make ring granulator) , model
Read moreHiring services of experts / professional for atlas make screw type oil free air compressors (qty-07 nos.), model zr-275 installed at ( 2x600mw) , katpp ,rvunl, jhalawar for one year term.
Hiring services of experts / professional for atlas make screw type oil free air compressors (qty-07 nos.), model zr-275 installed at ( 2x600mw) , katpp ,rvunl, jhalawar for one year term.
Read moreDesign, engineering, supply, erection, testing and commissioning for the performance improvement and modification of boiler to mitigate high sh and rh spray of unit 1and 2 (2x600 mw), katpp, rvunl, jhalawar
Design, engineering, supply, erection, testing and commissioning for the performance improvement and modification of boiler to mitigate high sh and rh spray of unit 1and 2 (2x600 mw), katpp, rvunl, jhalawar
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreof your Industry type