Tender Details

Particulars Details
Title
Erection Of 8 Span, 440v Oh Lighting Line For Upcoming Site Of Bkb Sump At Quarry 1 Of Ppr Patch Under Ashok Ocp (Route Length 400 M).
Description
Erection Of 8 Span, 440v Oh Lighting Line For Upcoming Site Of Bkb Sump At Quarry 1 Of Ppr Patch Under Ashok Ocp (Route Length 400 M).
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_287582_1
Reference
Number
PO(AK)/PE(EnM)/e-NIT/23-24/51
Tender Fee -
EMD 1600
Tender Value -
Place Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date September 01, 2023 14:30
End Date
Expired 11/09/2023

Expired 1111 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of 440v oh line (18 span) for illuminating newly constructed haul road from tss 4202 to departmental working face (2) relocation of 440v oh lighting line behind ppr parking for upcoming dumper parking under ppr patch under ashok project, ppr

Erection of 440v oh line (18 span) for illuminating newly constructed haul road from tss 4202 to departmental working face (2) relocation of 440v oh lighting line behind ppr parking for upcoming dumper parking under ppr patch under ashok project, ppr

Read more
Erection of 5 span, 3.3kv o/h line from existing last single pole of bkb sump towards upcoming site of sump under ashok ocp.

Erection of 5 span, 3.3kv o/h line from existing last single pole of bkb sump towards upcoming site of sump under ashok ocp.

Read more
Erection of 6.6kv o/h line from (1) tss 4201 to quarry-2 sump up-coming departmental patch sump, route length-700m 400m respectively and (2) tss 4205 to rajdhar railway siding route length-800m etc as required under ppr patch of ashok ocp..

Erection of 6.6kv o/h line from (1) tss 4201 to quarry-2 sump up-coming departmental patch sump, route length-700m 400m respectively and (2) tss 4205 to rajdhar railway siding route length-800m etc as required under ppr patch of ashok ocp.

Read more
Erection of 6.6kv o/h line from (1) tss 4201 to quarry-2 sump up-coming departmental patch sump, route length-700m 400m respectively and (2) tss 4205 to rajdhar railway siding route length-800m etc as required under ppr patch of ashok ocp..

Erection of 6.6kv o/h line from (1) tss 4201 to quarry-2 sump up-coming departmental patch sump, route length-700m 400m respectively and (2) tss 4205 to rajdhar railway siding route length-800m etc as required under ppr patch of ashok ocp.

Read more
Repairing/reconditioning of skid, base and installation of pump set with provision of v-belt and link belts for pump installation at bkb and quarry 2 sump under ashok ocp, ppr area.

Repairing/reconditioning of skid, base and installation of pump set with provision of v-belt and link belts for pump installation at bkb and quarry 2 sump under ashok ocp, ppr area.

Read more
Erection of 440v oh line (20 span) for watering plantation area near pilot mine reclamation area from 1002 conveyor head and dismantling of 17 span 440v oh lighting line from cisf post near 14 no weigh bride to abandent weigh bridge no 8 under ppr pa

Erection of 440v oh line (20 span) for watering plantation area near pilot mine reclamation area from 1002 conveyor head and dismantling of 17 span 440v oh lighting line from cisf post near 14 no weigh bride to abandent weigh bridge no 8 under ppr pa

Read more
Erection of 10 span 440v oh lighting line in departmental dumping and dismantling of idle 10 span 440v oh lighting line from 3 mva to crossing near tss 4202 under ashok ocp.

Erection of 10 span 440v oh lighting line in departmental dumping and dismantling of idle 10 span 440v oh lighting line from 3 mva to crossing near tss 4202 under ashok ocp.

Read more
Job1.(1) re-erection of 3 span 440v oh lighting line at police picket which was damaged during high wall fall, (2) re-erection of 4 span 440v oh lighting line along pipe ramp of quarry-2 and (3) erection of extra conductor for providing 3 phase power

Job1.(1) re-erection of 3 span 440v oh lighting line at police picket which was damaged during high wall fall, (2) re-erection of 4 span 440v oh lighting line along pipe ramp of quarry-2 and (3) erection of extra conductor for providing 3 phase power

Read more
Erection of 230v oh lighting line 4 span for starexpress camp near kabristan (2) 1 span for upcoming plr check post near sainik check post with wiring under ashok ocp (route length-200m 50m).

Erection of 230v oh lighting line 4 span for starexpress camp near kabristan (2) 1 span for upcoming plr check post near sainik check post with wiring under ashok ocp (route length-200m 50m).

Read more
Shifting of lighting line for new outsourcing area road at quarry no 3 of 440v 220v oh line at kathara colliery.

Shifting of lighting line for new outsourcing area road at quarry no 3 of 440v 220v oh line at kathara colliery.

Read more
Click Here to Download Dockets
of your Industry type