Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps 1 Operation Circle Cad Cwph Rectification Of Retrieved Defective Deflector Plate Assemblies Of Cw Ps
|
| Description |
Nctps 1 Operation Circle Cad Cwph Rectification Of Retrieved Defective Deflector Plate Assemblies Of Cw Ps
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_554944_1 |
|
Reference Number |
CE/NCTPS-I/SE/OPN/08/2025-26 |
| Tender Fee | 0 |
| EMD | 5700 |
| Tender Value | - |
| Place | NCTPS - I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=663012 |
| Start Date | May 09, 2025 00:00 |
| End Date |
Expired
22/05/2025
Expired 512 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad cwph ii unit iv annual overhauling of travelling water screen 4a to 4d for the year 2026 2027
Ttps operation circle cad cwph ii unit iv annual overhauling of travelling water screen 4a to 4d for the year 2026 2027
Read moreTtps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Ttps operation circle cad cwph ii unit v annual overhauling of travelling water screen 5a to 5d for the year 2026 to 2027
Read moreTtps operation circle cad cwph i unit iii annual overhauling of internal and external assembly and reconditioning of c.w.p internal spares 3b, 3c and 3d of unit iii
Ttps operation circle cad cwph i unit iii annual overhauling of internal and external assembly and reconditioning of c.w.p internal spares 3b, 3c and 3d of unit iii
Read moreTtps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Ttps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Read moreTtps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Read moreNctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreTtps es circle em iii rectification of defective stator water expansion tank level regulator by fabrication of new level regulator bushing phosphors bronze material including cutting drilling machining and blue matching work assembling and allied wor
Ttps es circle em iii rectification of defective stator water expansion tank level regulator by fabrication of new level regulator bushing phosphors bronze material including cutting drilling machining and blue matching work assembling and allied wor
Read moreTtps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Ttps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Read moreNctps ii m i circle ca cwph fabrication of drive shaft from retrieved worn
Nctps ii m i circle ca cwph fabrication of drive shaft from retrieved worn
Read moreof your Industry type