Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Nctps I Operation Circle O And E Division Fire Fighting Unit Ii Design Fabrication Erection Of New Detector Network For Inside Cable Gallery At 0 Mtr Elevation And 10 Point 5 Mtr Elevation
|
Description |
Nctps I Operation Circle O And E Division Fire Fighting Unit Ii Design Fabrication Erection Of New Detector Network For Inside Cable Gallery At 0 Mtr Elevation And 10 Point 5 Mtr Elevation
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 31200 |
Tender Value | |
Place | NCTPS - I |
Link |
AAAAAAAAAA Login to view |
Start Date | July 06, 2025 00:00 |
End Date |
19/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i operation circle o and e division fire fighting unit ii design fabrication erection of new detector network for inside cable gallery at 0 mtr elevation and 10 point 5 mtr elevation
Nctps i operation circle o and e division fire fighting unit ii design fabrication erection of new detector network for inside cable gallery at 0 mtr elevation and 10 point 5 mtr elevation
Read moreNctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreNctps i operation circle o and e dn fire fighting unit i ii and iii attending failure defective deluge systems of hvws mvws at c row of outside cable gallery
Nctps i operation circle o and e dn fire fighting unit i ii and iii attending failure defective deluge systems of hvws mvws at c row of outside cable gallery
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreNctps i operation circle o and e division fire fighting overhauling of vertical extended shaft pump erected in sump room no 2 3 4 and 5 of drain oil system in transformer yard
Nctps i operation circle o and e division fire fighting overhauling of vertical extended shaft pump erected in sump room no 2 3 4 and 5 of drain oil system in transformer yard
Read moreNctps i operation circle o and e division fire fighting overhauling of diesel engine operated higher elevation fire pump and sel engines in fire protection system at raw water pump house
Nctps i operation circle o and e division fire fighting overhauling of diesel engine operated higher elevation fire pump and sel engines in fire protection system at raw water pump house
Read moreNctps i operation circle o and e division fire fighting overhauling hydraulic testing and periodical maintenance of fire extinguishers for a period of one year from the date of handing over of site
Nctps i operation circle o and e division fire fighting overhauling hydraulic testing and periodical maintenance of fire extinguishers for a period of one year from the date of handing over of site
Read moreNctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Nctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Read moreNctps i operation circle o and e division fire fighting carrying out periodical prive maintenance works in fire protection pumps sluice valves of hydrant and hvws system for a period of one year from the date of handing over of site
Nctps i operation circle o and e division fire fighting carrying out periodical prive maintenance works in fire protection pumps sluice valves of hydrant and hvws system for a period of one year from the date of handing over of site
Read moreNctps 1 operation circle o and e div fire fighting overhauling and replacement of shaft and sleeve in the jockey pump a and b for hvws emulsifier system
Nctps 1 operation circle o and e div fire fighting overhauling and replacement of shaft and sleeve in the jockey pump a and b for hvws emulsifier system
Read moreof your Industry type