Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Rain Damages To Wss Mohal Gadauri Jarad In Tehsil Bhuntar Distt Kullu Hp
|
Description |
Sh Butt Welding Of Gravity Main
|
Organisation | HP Irrigation and Public Health | State Govt. and UT |
Tender Id | 2025_HPIPH_103768_1 |
Reference Number |
321-371 Mohal Gadauri |
Tender Fee | 500 |
EMD | 8910 |
Tender Value | |
Place | Mohal Gadauri |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=152256 |
Start Date | April 10, 2025 22:30 |
End Date |
18/04/2025 ( Expired 2 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreNiet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read morePlc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read moreConstr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Constr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Read moreConstruction of 1500 mm dia pile work malav distt. aligarh
Construction 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh in distt- aligarh (u.p.)
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreMonsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Read moreWidening and strengthening of link road from sh - 1 to hangoli via samlehri in panchkula distt. (road id - 2849)
Widening and strengthening of link road from sh - 1 to hangoli via samlehri in panchkula distt. (road id - 2849)
Read moreCs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Read moreof your Industry type