Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Clearance Of Weed, Jala, Booty, Sarkanda Etc From Dangdhera Drain In Between Rd 2000 To 8000 And 14000 To 23000.
|
| Description |
Estimate For Clearance Of Weed, Jala, Booty, Sarkanda Etc From Dangdhera Drain In Between Rd 2000 To 8000 And 14000 To 23000.
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2026_WR_165496_1 |
|
Reference Number |
78/2026-27 |
| Tender Fee | 1500 |
| EMD | 13000 |
| Tender Value | |
| Place | SAS NAGAR |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335765 |
| Start Date | April 08, 2026 15:30 |
| End Date |
Expired
20/04/2026
Expired 82 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc block with drain for cleanliness in gragaurav path from thakurji temple to sadons houses in the populated area of gram panchayat shyamsar
Construction of cc block with drain for cleanliness in gragaurav path from thakurji temple to sadons houses in the populated area of gram panchayat shyamsar
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreEstimate for clearance of sarkanda,weed,jala,booti,etc from chachrari drain in between rd 0 to 43500
Estimate for clearance of sarkanda,weed,jala,booti,etc from chachrari drain in between rd 0 to 43500
Read more161/tibba tapprian rd 0-8000
Clearance of weed booty jali sarkanda tripidium bengalense silt obstructions etc from tibba tapprian khad in bw rd 0-8000, shri anandpur sahib
Read moreof your Industry type